Skip to content
Free quote. No obligation.Get a quote
Cost guide

Electrical permit fees by city

Panel and service permit lines from 63 city fee schedules, sorted by the least a homeowner pays at that city. Each row links to the city page and to the fee schedule it came from. 28 more cities post fees that do not fit one line, and 9 have no current fee line.

Get a quote

A round electric meter beside a permit clipboard on a stucco wall

How to read this page

Cities do not price permits the same way, and the posted line is often not what a small job pays. Some charge a flat issuance fee and a small line per panel. Others charge a single fee for the whole job, or price by project value. This page compares one thing: the line a city posts for a service or panel of about 200 amps, the most common residential permit job. It is not a quote and it is not a total.

  • Fee line is the dollar amount as the city posts it. If a city posts two parts, such as a permit fee plus a plan check fee for the same line, the parts are added and marked.
  • Issuance fee is the separate per-permit charge, shown only when the city lists it as a flat amount. It is usually added on top of the fee line.
  • Minimum permit is the smallest electrical permit the city issues, when it lists one. A small job pays the minimum even when the line is lower.
  • At least is the least a homeowner can pay: the fee line plus the issuance fee, raised to the minimum permit when that is higher. Plan check, surcharges and state fees can come on top, so it is a floor and not a quote. Rows are sorted by this figure.
  • As of is the date the fee source was last read for this page. Fees change, so confirm at the counter.

Plan check and re-inspections. In every row the fee is the line only and plan check and re-inspections are separate, except the 5 rows marked with a dagger (†), where the amount already includes plan review. San Clemente's line comes from Resolution 08-80, an older schedule that the city still posts as its current one.

Commercial permits can also add plan check, fire review and valuation-based fees. For one city, the city page shows every fee line that passed the filter, and the commercial city pages show the commercial column where one exists.

63 cities, sorted by panel or service fee line

Sorted by the least a homeowner pays, then by name. Posted lines only: nothing is averaged or estimated, and this is not a ranking of which city is cheapest.

CityFee lineIssuance feeMinimum permitAt leastSource and date
Garden Grove
Orange County
$37.00
Electrical service, 600 V max, 200 amps max
Not listedNot listed$37Fee schedule
ggcity.org, 2026-10-29
Los Angeles
Los Angeles County
$16.00
Service, 0 to 200 amps
$23.00$55 to $90$55Fee schedule
ladbs.org, 2026-10-29
La Habra
Orange County
$28.00
Single family meter (service/meter/panel line)
$28.00Not listed$56Fee schedule
lahabraca.gov, 2026-10-29
Whittier
Los Angeles County
$27.50
Service, up to 200 amps
$31.00Not listed$58.50Fee schedule
cityofwhittier.org, 2026-10-29
Lancaster
Los Angeles County
$51
Single phase service
$8Not listed$59Fee schedule
cityoflancasterca.org, 2026-10-29
Palmdale
Los Angeles County
$42.25
Services, panelboards and switchboards of 600 volts or less, up to 399 amps
$35.50Not listed$77.75Fee schedule
cityofpalmdaleca.gov, 2026-10-29
South Gate
Los Angeles County
$43.00
Service installation (includes one meter), 600 volts or less, not over 200 amperes
$35.31Not listed$78.31Fee schedule
cityofsouthgate.org, 2026-10-29
Pomona
Los Angeles County
$46.80
Services, panelboards and subpanels, up to 399 amps
$33.25Not listed$80.05Fee schedule
pomonaca.gov, 2026-10-29
Aliso Viejo
Orange County
$56.95
Services and switchboards, 600 amps or less
$25.26Not listed$82.21Fee schedule
avcity.org, 2026-10-30
El Cajon
San Diego County
$43.00
Electrical: meter upgrade / services to 200 amp
$45.00Not listed$88Fee schedule
elcajon.gov, 2026-10-30
Lake Forest
Orange County
$58.99
Service and switchboard sections less than 600 V
$32.00Not listed$90.99Fee schedule
lakeforestca.gov, 2026-10-30
Colton
San Bernardino County
$21.67 permit fee plus $72.67 plan check fee †
$94.34 combined
Service, 600 volts or less, up to 200 amps
Not listedNot listed$94.34Fee schedule
coltonca.gov, 2026-10-29
Chino
San Bernardino County
$27.25
Services of 600 volts or less and not over 200 amperes
$67.94Not listed$95.19Fee schedule
cityofchino.org, 2026-10-29
Arcadia
Los Angeles County
$98.06
Residential main panel upgrade to 200 A (fee paid on permit)
Not listedNot listed$98.06Fee schedule
arcadiaca.gov, 2026-10-29
San Bernardino
San Bernardino County
$38.21
Electrical service, up to 200 amps
$60.00$60$98.21Fee schedule
sanbernardino.gov, 2026-10-30
Santa Clarita
Los Angeles County
$64.00
Panel upgrade inspection
$36.00Not listed$100Fee schedule
santaclarita.gov, 2026-10-30
Irvine
Orange County
$68.60
Service, 600 V or less, 0 to 200 amps and 200 to 400 amps, per meter (residential)
$31.88$63.77$100.48Fee schedule
cityofirvine.gov, 2026-10-30
Laguna Niguel
Orange County
$61.27
Services and switchboards, 600 amps or less
$39.59Not listed$100.86Fee schedule
cityoflagunaniguel.org, 2026-10-30
Long Beach
Los Angeles County
$24 per service
Service, 600 volts or less, up to and including 200 amp
Not listed$104$104Fee schedule
longbeach.gov, 2026-10-29
Newport Beach
Orange County
$61.00
Service change, 600 V or less, not over 200 amperes
$45.00Not listed$106Fee schedule
newportbeachca.gov, 2026-10-30
Fountain Valley
Orange County
$85.20
New panel or upgrade, up to 250 amps
$21.30Not listed$106.50Fee schedule
fountainvalley.gov, 2026-10-29
Gardena
Los Angeles County
$43.00
Electrical service up to 200 A
$70.00Not listed$113Fee schedule
cityofgardena.org, 2026-10-29
Pico Rivera
Los Angeles County
$53.00
Service, switchboard or panel, up to 600 volts, up to 200 amps
$64.00Not listed$117Fee schedule
pico-rivera.org, 2026-10-29
Riverside
Riverside County
$90.00
Electrical service 0 to 200A
$41.00Not listed$131Fee schedule
riversideca.gov, 2026-10-30
Downey
Los Angeles County
$85.10 each
Panels and switchboards, 1 to 200 amps
$56.35$120.75$141.45Fee schedule
downeyca.org, 2026-10-29
Bellflower
Los Angeles County
$96.00
Electrical panel upgrade, residential, under 200 amps
$49.00Not listed$145Fee schedule
bellflower.ca.gov, 2026-10-30
Pasadena
Los Angeles County
$73.00
New or upgraded service equipment or subpanel, 0 to 200 amps
$78.00Not listed$151Fee schedule
cityofpasadena.net, 2026-10-30
San Clemente
Orange County
$118.00
Service, 600 volts or less, up to 200 amps
$35.00Not listed$153Fee schedule
sanclemente.gov, 2026-10-30
Claremont
Los Angeles County
$94.50
Services and subpanels, 600 V or less, not over 200 amps, including one meter
$61.80Not listed$156.30Fee schedule
claremontca.gov, 2026-10-29
Eastvale
Riverside County
$161.00
Electric service or subpanel, new or replacement, 1 to 400 amps
Not listedNot listed$161Fee schedule
portal.laserfiche.com, 2026-10-30
Tustin
Orange County
$123.01
Services, switchboard sections, panel boards: 600 V or less and not over 200 amps, each
$38.00Not listed$161.01Fee schedule
tustinca.org, 2026-10-30
Menifee
Riverside County
$103.00
Electrical service/panel up to 400 amps, single family residence
$59.75Not listed$162.75Fee schedule
menifee.ca.gov, 2026-10-30
Murrieta
Riverside County
$163.92 †
Electrical upgrade (panel/service upgrade, no complex scope), plan check + inspection
Not listedNot listed$163.92Fee schedule
murrietaca.gov, 2026-10-30
Montclair
San Bernardino County
$126.46
Services of 600 volts or less and not over 200 amperes (each)
$39.00Not listed$165.46Fee schedule
storage.googleapis.com, 2026-10-29
Santa Ana
Orange County
$67.81
Service meter, subpanel, switchboard or other distribution equipment, under 400 amps
$98.16Not listed$165.97Fee schedule
storage.googleapis.com, 2026-10-29
Anaheim
Orange County
$126.00
Service, meter or panel, 600 V or less, up to 200 amps
Not listed$167$167Fee schedule
anaheim.net, 2026-10-29
Culver City
Los Angeles County
$53
Service panel or subpanel, up to 200 amps
$114Not listed$167Fee schedule
culvercity.gov, 2026-10-29
Glendora
Los Angeles County
$118.00
Electrical service 0-600V, not over 225 amp (panel upgrade)
$52.00$118$170Fee schedule
cityofglendora.gov, 2026-10-30
Escondido
San Diego County
$176/permit
Service Panel Upgrade, residential (base permit fee)
Not listedNot listed$176Fee schedule
escondido.gov, 2026-10-30
Fontana
San Bernardino County
$105.00
Services of 600 volts or less and not over 200 amps
$71.00Not listed$176Fee schedule
fontanaca.gov, 2026-10-29
San Diego
San Diego County
$176.57
Panel replace/upgrade up to 200 amp (single family, duplex, townhouse; qualifies for Simple Permit)
Not listedNot listed$176.57Fee schedule
sandiego.gov, 2026-10-29
San Marcos
San Diego County
$150
New service, single phase
$50Not listed$200Fee schedule
sanmarcosca.gov, 2026-10-30
Baldwin Park
Los Angeles County
$170.00
Main service panel, up to 200 amps
$37.50 per permit$69$207.50Fee schedule
baldwinpark.com, 2026-10-29
Ontario
San Bernardino County
$172.00
Electrical service, 600 volts or less, not over 200 amperes
$41.00Not listed$213Fee schedule
ontarioca.gov, 2026-10-29
Temecula
Riverside County
$71.00
Electrical service 600V or less, not over 200 amps (each)
$142.00Not listed$213Fee schedule
temeculaca.gov, 2026-10-30
Burbank
Los Angeles County
$224.86 each
Panelboard
Not listedNot listed$224.86Fee schedule
burbankca.gov, 2026-10-30
Glendale
Los Angeles County
$232.00
Single-family electrical service, up to 225 amps
Not listed$155$232Fee schedule
glendaleca.gov, 2026-10-29
Apple Valley
San Bernardino County
$121.29
Electrical service, 600 volts or less, not over 200 amps
$121.29Not listed$242.58Fee schedule
applevalley.org, 2026-10-29
Yucaipa
San Bernardino County
$244.00
Electric service, 600 volts or less, up to 225 amps
Not listedNot listed$244Fee schedule
yucaipa.gov, 2026-10-29
Victorville
San Bernardino County
$260.00
Electrical service, 400 amps or less
Not listedNot listed$260Fee schedule
victorvilleca.gov, 2026-10-29
Cathedral City
Riverside County
$269 per permit
Expedited service panel upgrade, residential
Not listedNot listed$269Fee schedule
cathedralcity.gov, 2026-10-29
Carlsbad
San Diego County
$270.00
Simple single or combination permit (Mechanical/Electrical/Plumbing, not associated with a building permit); includes 'services of 600 volts or less and not over 200 amperes'
Not listedNot listed$270Fee schedule
carlsbadca.gov, 2026-10-31
Indio
Riverside County
$199
Electrical service under 600 amps
$79Not listed$278Fee schedule
indio.org, 2026-10-29
Norwalk
Los Angeles County
$196
Service panel upgrade, residential
$82Not listed$278Fee schedule
cms3.revize.com, 2026-10-29
Moreno Valley
Riverside County
$74.00 plan check + $155.00 inspection †
$229 combined
New service or additional panel, 600V or less, not over 200 amps
$51.00Not listed$280Fee schedule
moval.gov, 2026-10-30
Palm Desert
Riverside County
$172
Service panel upgrade, residential
$119Not listed$291Fee schedule
palmdesert.gov, 2026-10-29
Hemet
Riverside County
$198.00
Electrical panel install or upgrade (max 200 amp), Commonly Requested Minor Permits
$99.00Not listed$297Fee schedule
hemetca.gov, 2026-10-30
Beaumont
Riverside County
$345.00 †
Electrical panel / pedestal or sub-panel, max 200 amp: plan review + inspection
Not listed$156$345Fee schedule
beaumontca.gov, 2026-10-30
Corona
Riverside County
$372.00 †
Service change-out, single family, single phase (plan check + inspection)
Not listedNot listed$372Fee schedule
cdn.prod.website-files.com, 2026-10-30
Brea
Orange County
$285.00
Residential electrical main panel upgrade/replacement
$93.00Not listed$378Fee schedule
cityofbrea.gov, 2026-10-30
Upland
San Bernardino County
$392.00
New and upgrade to service equipment or subpanels, 0 up to 200 amperes
$82.00Not listed$474Fee schedule
uplandca.gov, 2026-10-29
Vista
San Diego County
$522.12
New/Replacement Panel (B-PMTNRPNL)
Not listedNot listed$522.12Fee schedule
vista.gov, 2026-10-31
Chino Hills
San Bernardino County
$538.00
Electrical Service / Main Panel
Not listedNot listed$538Fee schedule
chinohills.org, 2026-10-29

28 cities with fees that do not fit one comparable line

These cities post fees by amp, by project value, or as a plan check percentage, or they list only part of the permit. They are sorted by name, and the first line the city posts is shown. Open the city page for the full list.

CityFirst line postedFeeSource and date
Buena Park
Orange County
Permit issuance fee$25.00Fee schedule
buenapark.com, 2026-10-29
Chula Vista
San Diego County
EV charging station, residential (single-family or duplex)$863 total ($158 intake + $0 plan check + $705 inspection)Fee schedule
chulavistaca.gov, 2026-10-30
Covina
Los Angeles County
Permit issuance (building, mechanical, electrical, plumbing)$76.00Fee schedule
covinaca.gov, 2026-10-29
Diamond Bar
Los Angeles County
Building permit, total valuation $1 to $700 (floor for small electrical jobs priced by valuation)$93.33Fee schedule
diamondbarca.gov, 2026-10-29
El Monte
Los Angeles County
Permit issuance$51.69Fee schedule
elmonteca.gov, 2026-10-29
Fullerton
Orange County
Minimum electrical inspection fee$181.00 first hour + $97.00 each added hourFee schedule
cityoffullerton.com, 2026-10-29
Hesperia
San Bernardino County
Temporary electrical services, up to 5 additional poles$623Fee schedule
hesperiaca.gov, 2026-10-29
Huntington Beach
Orange County
Permit processing charge (flat, per permit)$41.00Fee schedule
cms3.revize.com, 2026-10-30
Inglewood
Los Angeles County
Electrical permit issuance fee$28Fee schedule
cityofinglewood.org, 2026-10-29
La Mesa
San Diego County
Electrical permit issuance, each permit$44.10Fee schedule
cityoflamesa.gov, 2026-10-30
Lake Elsinore
Riverside County
Electrical permit, miscellaneous (base fee)$130.00Fee schedule
lake-elsinore.org, 2026-10-30
Lakewood
Los Angeles County
Permit issuing fee, each$41.35Fee schedule
dpw.lacounty.gov, 2026-10-30
Mission Viejo
Orange County
Electrical permit issuance fee$25.00Fee schedule
missionviejo.gov, 2026-10-30
Oceanside
San Diego County
Simple M.P.E. permit without plans, residential (single family and duplex)$215.45Fee schedule
ci.oceanside.ca.us, 2026-10-30
Orange
Orange County
Service or panel, up to 1,000 amps$426 eachFee schedule
citydocs.cityoforange.org, 2026-10-29
Palm Springs
Riverside County
Simple permit, electrical$284.00Fee schedule
palmspringsca.gov, 2026-10-29
Placentia
Orange County
Electrical permit issuance fee, each permit$30.00Fee schedule
placentia.org, 2026-10-29
Poway
San Diego County
Individual electrical permit, residential (not associated with a building permit)$157Fee schedule
poway.org, 2026-10-30
Rancho Cucamonga
San Bernardino County
EV Charge$343Fee schedule
cityofrc.us, 2026-10-29
Redlands
San Bernardino County
Electrical permit issuance$74Fee schedule
redlands.gov, 2026-10-29
Redondo Beach
Los Angeles County
Electrical permit issuance$63.00Fee schedule
cms2.revize.com, 2026-10-29
Rialto
San Bernardino County
Building plan check100% of the permit feeFee schedule
yourrialto.com, 2026-10-29
Santa Monica
Los Angeles County
Single trade permit, residential (per dwelling unit), includes 3 inspections max$444.65Fee schedule
data.santamonica.gov, 2026-10-29
Santee
San Diego County
Single phase service, per 100 amps$55.44Fee schedule
cityofsanteeca.gov, 2026-10-29
Torrance
Los Angeles County
Residential permit fee at project value $5,001 to $5,100 (example row)$190Fee schedule
torranceca.gov, 2026-10-29
West Covina
Los Angeles County
Permit issuance fee, electrical (each permit)$55.02Fee schedule
westcovina.gov, 2026-10-29
Westminster
Orange County
Permit issuance$65 per permitFee schedule
westminster-ca.gov, 2026-10-29
Yorba Linda
Orange County
Rooftop solar, residential, 15 kW or less$450.00Fee schedule
yorbalindaca.gov, 2026-10-29

Cities with no current fee line

For 9 cities, no fee line is shown here. In these cases no current city fee page was available, the amount posted was only a proposal or a draft, or the schedule was tied to project value and not a fixed line. Unconfirmed amounts are left out, so a blank here does not mean the permit is free. Ask the building department for the electrical permit fee, plan check and any surcharges before you budget.

What a permit fee covers, and what it does not

Base permit fee. The charge for issuing the permit and for the inspections the city lists with it. Some cities split it into an issuance fee and a line for each item, such as a panel. Others charge one amount per job.

Plan check. A review of drawings before the permit issues. Many cities charge it as a percentage of the permit fee or an hourly rate, and some need it only for larger jobs. Where the row says it includes plan review, the amount already has it.

Other charges. Technology fees, general plan surcharges, state fees, re-inspection fees and fire review are separate. Commercial jobs also bring valuation-based tables in many cities. The panel upgrade cost guide shows where the permit sits in the full price, and the Orange County commercial page shows how permit offices and fire review differ across one county.

Method

  1. Each city page carries a list of fee lines copied from the city's own fee schedule or permit page, with a link to the document.
  2. The same filter that builds the city pages is used here. A fee shows only if it is a confirmed, current amount. Proposed, draft and recommended amounts are dropped, and we show the newest schedule the city publishes that is in force.
  3. For the comparison, the first line that names a service, panel, switchboard or meter, excluding temporary power, reset, EV, solar, plan check and re-inspection lines, is used. A per-amp rate is not used, and neither is a line whose bracket does not cover a 200 amp service. Where a city posts a permit part and a plan check part for the same line, they are added and the two parts are shown.
  4. The minimum permit is the first line that names a minimum permit or inspection fee, other than plan check and hourly rates. "At least" is the fee line plus the flat issuance fee, raised to the minimum permit when that is higher. Rows are sorted by it. Nothing is averaged and no fee is estimated.
  5. The as-of date is the date the fee source was last read. A new schedule can post at any time.

Questions people ask

Can I rank cities by the permit fee line?

Not by the fee line alone. In this table the least a homeowner pays is the fee line plus any flat issuance fee, raised to the city's minimum permit when that is higher. 10 of the 63 cities list a minimum permit, and for some of them it is larger than the panel line. Plan check, surcharges and state fees are extra, and the cities in the other tables post fees that do not reduce to one line. The order is a starting point for a question to the permit counter, not a ranking of which city is cheapest.

Is the permit fee the same as the total cost of the permit?

No. The fee in the table is one line from the city fee schedule, usually the base charge for a service or panel of about 200 amps. Many cities add an issuance fee, plan check, a technology or general plan surcharge and a state fee. Commercial work can also carry fire review. Ask the permit counter for the full total.

Why are some cities shown with no fee line?

9 of the 100 cities have no current fee line here. No current city fee page was available, the posted amount was only a proposal, or the schedule was tied to project value and not a fixed line. Unconfirmed amounts are left out on purpose. Call the building department for the amount.

Who pays the permit fee on an electrical job?

The licensed electrician usually files the permit and the fee is part of the quote. Ask for it to be shown as its own line. If the city charges plan check or re-inspection, those can change the final bill, so a good quote says who pays for them.

How often do city fee schedules change?

Many cities update fees once a year, often on July 1 or at a council vote, and some index them to a construction cost index. The as-of date in the table is when the fee source was last read for this page. If a fee matters to a budget, confirm it with the city before you file.

Related

All 91 fee schedule links
Call (909) 552-7102Quote