Power from City of Colton
Electrician in Colton: Colton Electric Utility, not SCE
Colton runs its own electric utility, so SCE rebates, SCE rates and SCE shutoffs do not apply. CEU approves the panel spot, disconnects the power and inspects first.


Electric utility
City of Colton
Colton Electric Utility (City of Colton)
City or district utility. SCE programs do not apply. Utility site
Permit office
City of Colton Development Services Department, Building and Safety Division
(909) 370-5079 · Permit page · Online portal
Different from SCE: your meter and rebates come from City of Colton.
Colton is served by Colton Electric Utility (City of Colton), not Southern California Edison. Service upgrades, meter work and rebates go through that utility, so SCE programs do not apply.

Permit fees in Colton
City of Colton Development Services Department, Building and Safety Division
| Item | Fee |
|---|---|
| Service, 600 volts or less, up to 200 amps City of Colton Development Services Building and Safety Permit Fee Schedule, Residential. | $21.67 permit fee plus $72.67 plan check fee |
| Service, 600 volts or less, over 200 to 1,000 amps City of Colton Development Services Building and Safety Permit Fee Schedule, Residential. | $32.50 permit fee plus $109.00 plan check fee |
| Electric meter, residential reset or upgrade City of Colton Development Services Building and Safety Permit Fee Schedule, Residential. | $97.50 |
| Plan checks with no listed fee City of Colton Development Services Building and Safety Permit Fee Schedule, Residential. | $104.64 per hour, 1 hour minimum |
Taken from the city's fee page. Fees change, and other charges such as plan check can apply. Confirm at the permit counter. Compare permit fees across cities.
Turnaround. The city's EV charger guideline says the review and approval process takes only a few minutes at the counter when the information is complete. Inspections are typically the work day after the request.
EV charger permits. Colton's Building and Safety Division publishes 'Electrical Vehicle Charging Systems in Single Family Residence: Plan Review and Permitting Requirements'. An electrical permit is required for Level 1 (120 V) and Level 2 (240 V, 40 A). Permits are issued over the counter, electrical plans are not required, and the counter staff review an electrical load calculation sheet and the manufacturer's installation guide. AB 1236 (Gov. Code 65850.7) requires every city to run an expedited, administrative review for EV charger permits and publish a checklist, and AB 970 (Gov. Code 65850.71) adds review timelines (GO-Biz).
Inspections. Counter hours 7:30 a.m. to 5:00 p.m. Monday to Thursday. Inspections: Building & Safety (909) 370-5131 after CEU approves a panel. The city's online eTRAKiT portal handles applications and payments.
Rebates listed for Colton
From City of Colton and the city
| Program | Amount |
|---|---|
![]() CEU Commercial EV Charger Rebate CEU commercial customers inside CEU territory; one per business | Up to $5,000 with a separate utility meter or $2,500 for a standard 'dumb charger' connection; first come, first served |
Amounts as listed by each program, October 2026. Programs have limits and rules.
$2,500 to $4,500
A regional range from the sources on the cost page. Your electrician gives the actual quote after a look.
Get this quote
The city is the utility
Colton Electric Utility owns the power plant, the substations and the lines inside city limits. No community choice program serves the city. Residential customers pay a tiered rate, and time-of-use pricing is reserved for services over 200 kW. For an EV owner, that means the way to control cost is to watch total monthly use, since a charger pushes usage into the higher tiers. Read time-of-use rates for EV owners to see what Colton households miss.
CEU’s panel steps come before the city’s
CEU publishes its own change-out procedure, and the order is the point. The panel location is approved first, and the power company’s inspector looks at the new panel before the city inspector does. Pay CEU’s fees at City Hall, then pay permit fees at Development Services. Because the disconnect has to be coordinated with CEU ahead of time, schedule the panel work for a morning when both inspections can finish. See panel upgrade permit and inspection and meter and service mast for what the electrician has to build.
Chargers at the counter
The city requires an electrical permit for both Level 1 and Level 2 chargers, issued at the counter. The residential fee schedule posted online lists service fees by size but no charger line, so call the counter at (909) 370-5079 for the price. State law also requires a streamlined path for chargers, covered in AB 1236 permit rules. Before you go in, have a load calculation ready.
Older stock, electric heat
Four in ten Colton homes (39 percent) predate 1970, and 15 percent predate 1950, even though the median year is 1979. Only about 10 percent went up after 2000. About 34 percent heat with electricity, so winter load sits on the service as well as summer cooling. In a house from before the 1970s, a partial rewire can be the sensible companion to a panel upgrade, because new circuits are cheapest while the walls and panel are already open.
Outages without shutoffs
Colton is not on SCE’s shutoff lists because the city runs its own utility. The worst documented outage was a lightning strike at the main substation on August 31, 2017. It cut power across the area, closed schools and opened cooling centers. That is a reason to think about backup power even without wildfire shutoffs.
What the homes in Colton look like
U.S. Census Bureau, American Community Survey; QuickFacts for Colton. Climate zone 10.
Working with City of Colton on a service change
CEU is the electric provider inside Colton city limits, so SCE programs such as Charge Ready Home and SCE TOU plans do not apply. SCE's PSPS program does not apply to Colton customers. CEU is listed as a member of the Southern California Public Power Authority. Customers outside the city limits in nearby unincorporated areas are served by SCE or other utilities, so confirm the bill.
CEU publishes its own residential main service panel change-out procedure (form revised August 2024). Weatherhead minimum 18 inches (36 recommended), panel center 48 to 75 inches, 200 amp main breaker maximum, 2022 California Electrical Code clearances.
EV rate. There is a commercial EV charger rebate (up to $5,000 for a separately metered charger, $2,500 for a standard connection). A residential EV rebate listing says that program is fully subscribed and unavailable.

Backup power for shutoff days
Shutoffs and fire weather in Colton
Shutoff record: Named on a possible-shutoff list only
Colton specifics
- CEU owns a power plant and five substations and serves about 16,800 residential accounts, so SCE rebates (Charge Ready Home), SCE time-of-use plans and SCE's PSPS program do not apply. Source
- Time-of-use rates exist only for services over 200 kW. Source
- Colton's Building and Safety Division issues residential EV charger permits over the counter without electrical plans. Counter staff review a load calculation sheet and the manufacturer's installation guide, and the guideline says approval takes only a few minutes. Source
Common electrical jobs in Colton
Other cities close by
Questions about electrical work in Colton
Do SCE rebates apply to me if I live in Colton?
No. Colton Electric Utility serves homes inside city limits, so SCE programs such as Charge Ready Home and SCE time-of-use plans do not apply. CEU lists its own rebates, and its charger rebate is for commercial customers. Homes just outside city limits may be on SCE, so confirm the utility on your bill.
What is the process to upgrade my main panel in Colton, and who disconnects the power?
Start with CEU's Meter Spot Request Form for the panel location. CEU may ask for load calculations. Then get the construction permit, coordinate a same-day disconnect and reconnect with CEU, pass CEU's inspection and then the city's. If that is not coordinated, CEU charges $250. If both approvals come after 3 p.m., power waits until the next working day.
Will an EV charger push my Colton electric bill into the higher tiers?
It can. CEU's residential rate has three usage tiers, and each tier costs more per kWh than the last. A Level 2 charger adds a few hundred kWh a month, and in a house that already uses a lot, that extra use lands in the top tier. Residential customers have no time-of-use rate. Ask CEU for the current rate sheet.
How fast is a Colton EV charger permit?
The city's guideline says approval takes a few minutes at the counter when the information is complete, and inspections are typically the work day after the request. Counter staff review an electrical load calculation sheet and the manufacturer's installation guide. Electrical plans are not required, but you should confirm that with the counter before you go.
Is there a rebate for a home EV charger from Colton Electric?
CEU's listed charger rebate is for commercial customers: up to $5,000 for a separately metered charger or $2,500 for a standard connection. For a home charger, ask CEU whether any residential program is open now, and check its residential rebate list for other equipment such as A/C and weatherization.
Send a photo, get a range.
Share your ZIP and a photo of your panel. Your request goes to a licensed partner electrician, who contacts you.
Get this quoteAurion Electric is a referral service operated by Roviq LLC. Electrical work is done by a licensed partner electrician.

