Power from SCE
Electrician in Aliso Viejo: Civil Code 4745 for condo EV chargers
Most Aliso Viejo homes are condos, townhomes or houses inside associations, so an EV charger starts with a written request to the HOA under Civil Code 4745. The city side is simpler: services are priced as one flat line.


Electric utility
SCE
Southern California Edison (SCE) and SDG&E, split by address
Serves part of Aliso Viejo. Utility site
Permit office
City of Aliso Viejo Building and Safety Department (Building Division)
(949) 425-2540 · Permit page · Online portal
Permit fees in Aliso Viejo
City of Aliso Viejo Building and Safety Department (Building Division)
| Item | Fee |
|---|---|
| Permit issuance fee FY 2026-27 Master Schedule of Fees, effective July 1, 2026 through June 30, 2027. The schedule also states a $58.83 base permit fee plus issuance applies to plumbing, electrical and mechanical permits. | $25.26 |
| Services and switchboards, 600 amps or less FY 2026-27, flat fee. Over 600 to 1,000 amps is $113.90; over 1,000 amps is $142.23. | $56.95 |
| Sub panel, 600 amps or less FY 2026-27. | $56.95 |
| Electrical circuit or conduit, each FY 2026-27. Used for a new EV charger circuit. | $28.34 |
| Meter release FY 2026-27; also listed for temporary meter release and pedestal meter. | $175.91 |
| Fixed appliance (range, dryer, water heater, etc.), each FY 2026-27. | $28.34 |
| Electrical plan review FY 2026-27. Plan check or inspection fees may also be owed to Orange County Fire Authority. | 65% of total electrical fees |
Taken from the city's fee page. Fees change, and other charges such as plan check can apply. Confirm at the permit counter. Compare permit fees across cities.
Turnaround. The city offers an instant solar permit through SolarAPP+. Permits are submitted, paid and inspected in the Customer Self-Service portal.
EV charger permits. Chapter 13.10 of the municipal code creates an expedited permit process for EV charging stations and requires the building official to adopt a checklist of requirements for expedited review, consistent with AB 1236. Inspections are requested through the same portal. An account is required.
Inspections. Request inspections through the Customer Self-Service portal. An account is required to schedule.
No city-run rebate is listed for Aliso Viejo. See the rebate finder for programs from SCE and the state.
$2,500 to $4,500
A regional range from the sources on the cost page. Your electrician gives the actual quote after a look.
Get this quote
Start with the association
Aliso Viejo is a master-planned city that was approved in 1979 and incorporated in 2001. Its villages are run by associations, and many buildings share meter rooms and panels. That is why Civil Code 4745 comes up before any wiring plan. The law voids HOA rules that effectively ban a charger and sets a 60-day clock on the written decision. If the charger goes in a common area, the HOA can require a licensed contractor and proof of insurance. The page on HOA and condo EV chargers walks through the request.
A shared panel also means a panel change may need HOA approval, not only a city permit. Send the electrician’s drawing with your request. It speeds the decision.
How the city prices the work
The Building Division takes permits and inspections through the Customer Self-Service portal, and you need an account to book an inspection. The fee table has no EV charger line, so a charger circuit is priced like any other new circuit, and a charger with a subpanel is counted for both. Ask the electrician to show which lines apply before work starts, and see the panel permit and inspection page.
Solar follows its own online path through SolarAPP+, which matters if you pair panels with a home battery.
Newer buildings, tighter capacity
Homes from the 1980s through the 2000s rarely have worn-out wiring, so the question is capacity. A townhome with a 100 amp panel and an electric dryer may have no room left for a Level 2 charger. A load calculation answers that, and load management can let a charger share a feed without a new service. Condos on a shared feed are the tight cases, because the answer depends on what the neighboring units already draw. Ask the HOA or property manager who owns the feeder and the meter room before you price anything, and get that answer in writing alongside the charger approval.
Edison and the meter
SCE delivers power to the part of Aliso Viejo west of Alicia Parkway, and SDG&E serves the east side, per the city’s utilities page. Check your bill, because the utility that serves your address sets the meter once the city releases the job. The rest of this section describes SCE. SCE takes most panel upgrade requests online and the meter step can take weeks after building clearance. Count that after the city finishes, not inside it. Read the time-of-use guide before you pick a charging schedule, and check the electrician visit checklist.
Aliso Viejo homes: age, count and heating
U.S. Census Bureau, American Community Survey; QuickFacts for Aliso Viejo. Climate zone 6.
Getting power work done with SCE
SCE sets and reconnects the meter. Its published targets cover only SCE steps, and city review time is extra. How the steps fit together.

Backup power for shutoff days
Fire weather and power shutoffs
Shutoff record: None on record
The city borders Aliso and Wood Canyons Wilderness Park, so brush-fire response is an Orange County Fire Authority matter, and the OCFA reviews plans on some permits.
Local details
- California law (Government Code 65850.7) requires each city to offer an expedited, streamlined permit for home EV chargers that follows a published checklist. Aliso Viejo's Building and Safety division can give you its current checklist. Call before you file. Source
- The Aliso Viejo schedule says that starting work on a building, mechanical, gas, electrical or plumbing system before getting the permit can cost double the required permit fees. Source
- Aliso Viejo offers an instant solar permit through SolarAPP+, so solar and battery work follow a separate online path from regular electrical permits. Source
Jobs homeowners here ask about
Near Aliso Viejo
Questions about electrical work in Aliso Viejo
Can I install an EV charger in my Aliso Viejo condo, and what must the HOA allow?
Yes, in most cases. California Civil Code 4745 voids HOA rules that effectively prohibit a charger, requires a written decision, and treats a request not denied within 60 days as approved. The association can set reasonable conditions. Ask for the written decision and keep every message you send.
Is Aliso Viejo's service fee a flat amount whatever the amp size?
The city's FY 2026-27 fee table lists a flat $56.95 for a service up to 600 amps, plus a $25.26 issuance fee and a $58.83 base permit fee for electrical permits. If plan review is needed, it is 65% of total electrical fees. A meter release is a separate $175.91 line, so ask which lines your job triggers.
Does the Aliso Viejo EV charger permit use a special checklist?
State law (Government Code 65850.7, from AB 1236) requires every city to offer an expedited permit for home chargers that follows a published checklist. The city does not post a processing time online, so call Building and Safety at (949) 425-2540 for the current form and expected timing.
When does the meter release fee apply to an Aliso Viejo permit?
The fee table has a $175.91 meter release line, which it also uses for temporary meter release and pedestal meters. Whether your panel job triggers it is a question for the Building Division before you sign a bid. SCE sets the meter only after the city clears the work.
Do I deal with the fire authority for my electrical permit?
Sometimes. The city's schedule says plan check and inspection fees may also be owed to Orange County Fire Authority. Ask the Building Division whether your scope triggers it. Starting work before the permit is issued can be assessed at double the permit fee, so wait for the permit.
Send a photo, get a range.
Share your ZIP and a photo of your panel. Your request goes to a licensed partner electrician, who contacts you.
Get this quoteAurion Electric is a referral service operated by Roviq LLC. Electrical work is done by a licensed partner electrician.
