Power from SCE
Electrician in Santa Monica: single trade permit and three inspections
In Santa Monica, SCE owns the wires and Clean Power Alliance buys the power, so your bill has two parts. The city lists a residential single trade permit at $444.65, and halves it for simple work.


Electric utility
SCE
Southern California Edison (SCE) delivery; Clean Power Alliance generation by default
Serves all of Santa Monica. Utility site
Permit office
City of Santa Monica Community Development, Building and Safety (Permit Services Center)
Permit fees in Santa Monica
City of Santa Monica Community Development, Building and Safety (Permit Services Center)
| Item | Fee |
|---|---|
| Single trade permit, residential (per dwelling unit), includes 3 inspections max | $444.65 |
| Single trade permit, residential: each additional inspection | $146.80 |
| Electrical plan review, over the counter / same-day review, standard, up to two reviews plan check line in the same dataset | $537.85 |
| Electrical plan review, formal plan review, standard, up to three reviews | $1,305.35 |
| Reinspection fee, single trade permit residential | $183.00 |
Taken from the city's fee page. Fees change, and other charges such as plan check can apply. Confirm at the permit counter. Compare permit fees across cities.
Turnaround. Same-day review exists for minor single-trade projects at the counter. Anything that does not qualify goes to formal plan review.
EV charger permits. The city has its own EV Charger Permit Application with an Eligibility Worksheet. Electrical upgrades needed for the charger, such as a panel change, require a separate building permit (per the city's Building Permit Application Types page).
Inspections. Online through Citizen Access. The city has a page, How to Schedule a Building Permit Inspection, and a daily list of scheduled inspections.
No city-run rebate is listed for Santa Monica. See the rebate finder for programs from SCE and the state.
$2,500 to $4,500
A regional range from the sources on the cost page. Your electrician gives the actual quote after a look.
Get this quote
Two companies on one bill
SCE owns the poles, wires and meters in Santa Monica. Clean Power Alliance buys the electricity as the city’s community choice program. That is why SCE’s own rate pages and your bill do not line up. SCE’s EV plan, TOU-D-PRIME, is open to homes with an EV, battery or electric heat pump, but the generation prices on your bill are Clean Power Alliance’s.
One more trap: the City of Los Angeles next door runs on LADWP. A house just across the city line may be on a different utility, so check the bill before reading a rebate guide. See the LADWP programs guide if that is you.
How the city handles permits
Permit Services Center staff take applications through Citizen Access, and larger projects also use ProjectDox, where the Fees Due task has to be completed or routing to reviewers is delayed. Minor single-trade work can get same-day review at the counter. Anything else goes to formal plan review, and the city does not publish a turnaround, so ask for one when you apply.
Plans are checked under the 2025 California Standards Code that took effect January 1, 2026. See California electrical code 2025 changes.
Multi-unit buildings and old bungalows
Only about 1 in 4 homes here are single-family, and just 28 percent are owner-occupied. Many buildings have a main distribution panel and a meter bank serving several units, so a change can involve the whole building. For chargers in those buildings, read the HOA and condo EV charger page.
More than half of Santa Monica homes (54 percent) predate 1970 and nearly a quarter predate 1950, against a 1968 median. The single-family blocks north of Montana, in Sunset Park and in Ocean Park are mostly 1920s to 1950s houses and bungalows, often with 100 amp service. Some sit in historic or landmark districts, which affects how an exterior meter or service mast can change. See the meter and service mast page.
Outages and the meter
Santa Monica is built out and flat, and the very high fire zone begins in the mountains to the north, not in the city. Documented outages here are equipment failures, such as a July 2022 substation interruption that cut power to about 20,000 customers. A home battery is how some neighbors cover that. SCE sets the meter only after the city clears the work, and the SCE steps follow city review rather than overlapping it; the panel upgrade timeline shows how the steps fit together. Salt air corrodes outdoor meter panels and conduit near the beach.
What the homes in Santa Monica look like
U.S. Census Bureau, American Community Survey; QuickFacts for Santa Monica. Climate zone 6.
Working with SCE on a service change
SCE sets and reconnects the meter. Its published targets cover only SCE steps, and city review time is extra. How the steps fit together.
Santa Monica's building page also hosts a Design Guide for Building Near SCE Power Lines.
Per SCE Rule 16, SCE energizes a new or changed service only after the building department tells SCE the customer-side work was inspected and is safe. SCE's electrician FAQ says SCE does not check permits, so the city permit comes first.
EV rate. SCE TOU-D-PRIME is the residential time-of-use plan for customers who attest to an EV, home battery or electric heat pump. Customers of Clean Power Alliance see CPA generation prices rather than SCE's generation prices, so published SCE per-kWh numbers do not match the bill.

Backup power for shutoff days
Shutoffs and fire weather in Santa Monica
Shutoff record: None on record
Santa Monica specifics
- The city has a dedicated EV Charger Permit Application with an Eligibility Worksheet, and requires a separate building permit if the charger needs a panel or service upgrade. Source
Common electrical jobs in Santa Monica
Other cities close by
Questions about electrical work in Santa Monica
Does Santa Monica charge by panel size?
No. The fee list has no separate panel size or EV charger line. It shows a residential single trade permit at $444.65, which includes up to three inspections, and says single trade residential fees are reduced 50 percent for simple work. Confirm the exact total at the Permit Services Center before you budget.
Do I need a separate permit for the panel when I install an EV charger in Santa Monica?
Yes, if the charger needs a panel or service upgrade. The city has its own EV Charger Permit Application with an Eligibility Worksheet. Electrical upgrades needed for the charger require a separate building permit, per the city's permit types page. Your electrician files both and the city inspects both.
Why does my Santa Monica bill have both SCE and Clean Power Alliance on it?
SCE delivers the power and keeps the poles, wires and meter. Clean Power Alliance, the community choice program the city belongs to, buys the electricity itself. You pay delivery charges to SCE and generation charges to Clean Power Alliance. SCE's published per-kWh generation prices will not match what you see on your bill.
Can I get a Santa Monica rebate for a panel upgrade when I switch from gas?
Possibly. Electrify Santa Monica ties a panel rebate to a gas-to-electric conversion, and it lists heat pump amounts of $600 to $1,200 for HVAC and $400 to $2,000 for water heaters. Program status changes, so check with the city before you buy equipment or sign a contract that depends on the rebate.
My Ocean Park bungalow is on a 100 amp panel. Is that enough for a heat pump and EV?
It may not be. Older Santa Monica houses were wired for much smaller loads than a charger, heat pump and induction range add together. An electrician adds up the loads in a load calculation. If the total passes 100 amps, a 200 amp service is the usual answer. A load-managed setup can sometimes avoid it.
Send a photo, get a range.
Share your ZIP and a photo of your panel. Your request goes to a licensed partner electrician, who contacts you.
Get this quoteAurion Electric is a referral service operated by Roviq LLC. Electrical work is done by a licensed partner electrician.