Replacing a breaker box with a new electrical panel typically costs $2,500 to $4,500 installed, including the permit, for a swap in place from 100 amps to 200 amps. Jobs that need a new service run, a moved meter or trenching run $5,500 to $10,000.

Get a quote

How a panel upgrade goes

  1. 1. PermitThe electrician files the city permit.
  2. 2. UtilityThe utility is told about the disconnect and meter work.
  3. 3. InspectionThe city inspects the new panel.
  4. 4. EnergizeThe utility reconnects and the circuits are checked.

Typical SoCal range, October 2026

$2,500 to $4,500

100A to 200A swap in place, breakers, permit. Starts from the published ranges listed under Sources. We moved the low or high end to fit Southern California, so this is an estimate, not a quote.

The short answer is $2,500 to $4,500 in the typical SoCal range as of October 2026. That figure is for the common job: the old panel comes out, a new 200-amp panel goes in at the same spot, breakers are moved over, and the city inspects it. This page is about the decision itself, not one amperage. If you already know you want 200 amps, see the 200-amp page. If you are thinking about 400 amps, see 400-amp service.

For when a home needs one and how the permit and utility steps run, see the electrical panel upgrades guide.

What the typical price covers

A standard quote usually lists:

  • A permit
  • A new main breaker panel from a major brand
  • A new meter socket
  • A grounding electrode and bonding
  • AFCI and GFCI breakers where code requires them
  • Coordination with the utility for the disconnect and reconnect
  • Inspection sign-off, if the proposal lists it

Not every quote includes every item. Read the line items before you compare totals.

When the price jumps

A national cost site says panel work is priced by amperage and by how much rewiring comes with it. It also says labor often makes up 40 to 60 percent of a job, at $40 to $120 an hour nationally. SoCal labor tends to sit above that.

Harder jobs run $5,500 to $10,000 in the typical SoCal range. These are jobs with a new service run, a moved meter or mast, trenching or stucco work. That band is a desk range and is not tied to one published source, so use it as a warning sign, not a promise.

Should you upgrade at all?

An upgrade makes sense when one of these is true:

  1. The panel is full and has no room for new circuits.
  2. You are adding a large load such as an EV charger, a heat pump or an ADU.
  3. The panel is a brand with known problems. See the Zinsco and Federal Pacific page and the Zinsco and Federal Pacific replacement cost.
  4. The breakers trip often, or the panel shows burn marks or rust.

A load calculation settles it. The guide on load calculations shows how an electrician reaches the number.

Reading the range before you call anyone

The low end, $2,500, fits a house where the panel stays put, the meter is close and the service wires are sound. The high end, $4,500, fits a house with one or two complications, such as a long run to the meter or extra breakers to move. Past $4,500 you are usually in the harder band, and the reason should be written in the quote. If a bid comes in well under $2,500, ask what is missing. Fixr lists an initial electrical inspection by an electrician at $125 to $250, and says some electricians credit that fee back if you hire them for the job. That is a separate visit from the city’s inspection of the finished work. A very low price often leaves out the meter socket, the surge device or the permit.

Permit and utility fees

Permit fees differ by city, and some cities charge more because of recent fee schedule changes. Instead of trusting a national range, see the permit fees page and check your city page, such as Los Angeles, San Diego or Riverside, or the county hubs. Utility work depends on who serves your address. Pasadena, Burbank and LADWP customers deal with city utilities, not SCE or SDG&E.

How to compare quotes

  • Ask each bidder for amperage, brand, and meter socket in writing.
  • Confirm the permit and inspection are in the price.
  • Ask who schedules the utility disconnect.
  • Check that repairs to drywall, stucco or paint are named as in or out.
  • Compare the same scope. A bid that skips the meter socket is not cheaper, it is smaller.

The quote checklist guide goes further.

What is not included

Typical exclusions are drywall repair, trenching for new underground conduit, a generator interlock or transfer switch, temporary power during the swap, and any rewiring beyond the panel. Rebates, where they exist, are not subtracted from these ranges.

What moves the price

FactorEffectRange
Where the panel and meter sitMoving a panel can add $1,000 to $4,000 (national figure). A far panel-to-meter distance can add $300 to $800 (desk estimate)
Underground or damaged serviceA corroded connection or bad conduit can add $400 to $1,200 (desk estimate)
Condition of the wiringA few circuit repairs cost little. Larger wiring work can push the total toward the top of the range
Walls, stucco and outdoor mountingOutdoor installs run higher than indoor in national data. Opening walls and patching are usually billed apart
Utility workIf the utility must change the meter base or service drop, the job moves into the harder $5,500 to $10,000 band

Panel upgrade cost by city

Each page uses that city's utility, permit office and fee schedule.

Riverside County
San Bernardino County
Diagram of a 200-amp panel with the main breaker, hot bus bars, single-pole and double-pole breakers, neutral and ground bars and circuit directory labeled
The parts inside a 200-amp panel. Illustration, not a photo of a specific job.

Questions people ask

Is a panel upgrade worth the money if nothing is wrong right now?

It can be, if you plan to add an EV charger, a heat pump, an ADU or solar. Each adds load that an old 100-amp panel may not carry. If the panel has free slots and you add nothing big, you can often wait. A load calculation by an electrician gives the real answer for your house.

Why is the SoCal price higher than the national average?

National guides put panel upgrades at $1,500 to $4,500, with a $3,000 average. Southern California runs toward the top of that band because of higher labor rates, permit fees and utility coordination. The range here sits at the top of the national band, so treat it as a starting point.

Does the quote include the permit?

It should, but check the written quote. Some electricians list the permit as a line item and some roll it into the price. Permit fees vary by city, so ask for the amount in writing. Skipping the permit is a bad trade, since uninspected work can cause trouble with insurance and a home sale.

How long is the power off during a panel upgrade?

There is no fixed time, and it depends on the job. The electrician schedules a disconnect with the utility, swaps the panel and calls for reconnection. Ask for the expected outage window in writing and plan around food storage and any medical equipment.

Related

Typical SoCal range

$2,500 to $4,500

100A to 200A swap in place, breakers, permit.

Get this quote
Brushed-metal electrical panel, circuit breakers and an EV charger on a white stucco wall of a SoCal home
Call (909) 552-7102Quote