Power from BWP

Panel and service upgrades with Burbank Water and Power

In Burbank the utility is the city's own, so the panel question is mostly a BWP question. Settle what BWP will charge before comparing contractor quotes.

Get a quote

Burbank area home, Southern California: Mid-century ranch homes on a San Fernando Valley street with hills behind

Get the utility side in writing first

Utility charges are the part of a panel quote that moves latest. In Burbank, BWP’s meter spot is the document that lists them, and it comes before any permit that includes a panel upgrade. Request it early and compare it against each bid. Ask every electrician for a quote that lists their own labor, materials and permit as separate lines, so the totals line up against the typical SoCal range on the panel cost page. The timeline guide explains the meter spot in general.

If the house might go to a larger service later, ask BWP whether the size changes what it charges. A standard 200 amp upgrade is the usual target, but the capacity rules for anything bigger are a question for BWP.

Bungalow panels and what to look for

Half of Burbank homes were built before 1960, and the median year is 1959. Panels from that era were sized for a few circuits and an electric range, not for a charger, a heat pump and a hot-summer air conditioner. Signs of trouble are breakers that trip on hot afternoons, a panel with no free slots, and stickers with the Zinsco or Federal Pacific name. Hot summers in climate zone 9 mean cooling already uses much of the capacity, which is often what pushes an owner to upgrade before adding anything.

Multi-unit buildings near the older parts of town add a wrinkle: the panel often serves more than one unit, so the decision belongs to the building owner.

The sequence, from the electrician’s side

The order is the BWP meter spot, then the city permit, then the work and inspection. After that BWP unlocks the meter, which depends on the permit number and payment of BWP fees. Reconnection is not the same day as the inspection, so plan the days without power with the electrician and ask who makes the call to BWP. Add the steps up before you promise a date to a landlord, a tenant or a solar installer waiting on the new panel. For other utilities’ versions of the same flow, see the utility coordination guide.

Fire season and the panel

BWP publishes its own Wildfire Mitigation Plan, and the Verdugo Mountains on the north edge of town have burned several times. No power shutoff event is documented for Burbank, but a hillside owner may still want to ask the electrician about battery-ready wiring while the service is open. If a charger is the reason for the work, the Burbank charger page covers the permit checklist and rate.

Diagram of the path from the utility pole through the meter and main breaker to household circuits
Where the utility side ends and your side begins. Illustration, not a photo of a specific job.

Utility and meter work

BWP's Electric Service Planning FAQ: book a residential appointment for a 'meter spot' (allow up to 5 business days to receive it by email). The meter spot lists any Aid in Construction (AIC) charges, which BWP says are generally about $500 to $4,000 for typical small residential upgrades. 200 A single-meter residential services are currently exempt from capacity charges. After the city permit and payment of BWP fees, call (818) 238-3575 with the permit number to unlock the meter. BWP says services are generally connected within 10 business days after the building division's final inspection.

Permit lines that can apply

ItemFee
Electrical permit issuing fee$77.52 per application
Electrical service, 600 volts or less, up to 1,000 amps$216.15 each
Panelboard$224.86 each
Electric vehicle charger, permit fee$255.92 each

City of Burbank Community Development, Building & Safety Division. Confirm the current amount at the counter.

Questions people ask

Why get the BWP charges before choosing an electrician?

Because two quotes can look far apart when one includes the utility's charges and the other leaves them out. Ask for BWP's written list of utility-side charges for your address first, then ask each electrician to price only their own work. That puts every bid on the same footing and avoids a late surprise.

Can I book the Burbank inspection online?

Yes. Request it in the city's online portal at least a day ahead, then call (818) 238-5220 between 7:00 and 7:45 a.m. on the day to confirm the time. An underground service needs at least two separate inspections, so ask the electrician how many visits to expect.

Does a Burbank panel swap qualify for the faster Tier 1 permit?

Possibly, if it is part of rebate-eligible electrification work. BWP's permit page describes a Tier 1 permit with no plan check for that work, available over the counter or online. A panel swap on its own may take a different route, so ask Building and Safety at (818) 238-5220 which tier applies.

Who decides on a panel upgrade in a Burbank rental?

The owner. Fewer than half of Burbank homes are owner-occupied, and the panel belongs to the building. A tenant can ask in writing with the electrician's findings attached, such as a full panel or a tripping breaker. Charger requests have extra legal backing under Civil Code 1947.6, but a panel upgrade request is still negotiated.

Panel upgrade in nearby cities

Related

Call (909) 552-7102Quote