How much does a 400 amp service upgrade cost?
Expect $8,000 to $12,000 for a 400 amp service upgrade, about triple a standard 200 amp swap. The total moves with the meter, the utility work and any trenching.

Compare the panel jobs
200A swap in place
Most homes. Panel and breakers replaced where the meter and wire stay.

- Supports an EV charger
- Handles modern appliances
- Permit included
$2,500 to $4,500
200A with a meter move or new service run
When the meter, mast or service wire has to change.

- Trenching or mast work
- Stucco or drywall repair extra
- Utility coordination
$5,500 to $10,000
Priced on this page400A service
Large homes with EV, pool and heat pump loads.

- Maximum capacity
- Supports several chargers
- Often needs utility work
$8,000 to $12,000
How a panel upgrade goes
- 1. PermitThe electrician files the city permit.
- 2. UtilityThe utility is told about the disconnect and meter work.
- 3. InspectionThe city inspects the new panel.
- 4. EnergizeThe utility reconnects and the circuits are checked.
Typical SoCal range, October 2026
$8,000 to $12,000
400A service, meter socket, panel(s). Built from the published ranges listed under Sources.
Expect $8,000 to $12,000 for a 400-amp service upgrade, a typical SoCal range as of October 2026 that matches the national cost site’s 400A figure. The price covers the 400-amp service, the meter socket and the panel or panels. That is a heavy job: bigger wire, bigger equipment, utility approval and often a wall of stucco to cut through.
To see who needs this size and how the utility’s part works, read the 400 amp service page.
Ask the first question before the price
Most houses do not need 400 amps. A 200-amp service carries a typical home plus an EV charger, and often a heat pump too. The load calculation decides. Read the guide on how a load calculation works and look at the 200-amp cost page first. The 400-amp job fits these cases:
- A large house with two air handlers or more
- A house with a pool, a spa and an ADU on the same service
- Two or more EV chargers plus electric heat and a hot tub
- A property that will be split into units with separate loads
- A small business on a residential lot (see commercial)
One big service or two 200s
The national cost site notes that two 200-amp panels can cost less than one 400-amp service when the utility requires placement at the back of the property. A paired setup can also reduce the size of the wire run. The tradeoff is more equipment and a second set of breakers to manage. Ask each bidder to price both.
Why 400-amp service costs so much more than 200
The jump from 200 to 400 is not only a bigger panel. It usually means:
- Heavier service conductors and conduit
- A different meter socket that the utility must accept
- Trenching for underground service. The national data warns this can add several thousand dollars at 400A.
- Utility engineering review before the work is approved
Each step has a waiting line. The utility coordination guide shows how that works.
The money gap is the real question
A 400-amp job costs about $5,500 to $7,500 more than the common 200-amp swap, using the two ranges on this site ($8,000 to $12,000 against $2,500 to $4,500). Before you pay that gap, ask what else would solve the problem. A load-management device for an EV charger runs $300 to $700 in NRG’s California data. A subpanel can fix a full panel. Two 200-amp panels may fit the load for less. Choose 400 amps when the load calculation says the house truly needs it, not because a bigger number feels safer.
Utility rules and permit fees
Because the service itself changes, the utility is a partner in the job, not just a bystander. Fees and timelines differ for SCE, SDG&E, LADWP and municipal utilities. See the city pages for your utility, or start at the county hub: Los Angeles, San Diego or Riverside. This site does not quote utility charges, because they change and depend on your address.
Comparing quotes
- Is the quote one 400A service or two 200A panels? Make every bidder price the same layout, then ask for the alternative.
- Does the price include trenching, or is that a separate provider? National data says trenching may be billed apart.
- Who handles the utility application and the meter?
- Does the quote name what happens to stucco, concrete or landscaping that gets cut?
- What does the electrician assume about the existing service? Ask for a site visit before the number is final.
What is not included
Trenching if billed separately, concrete and landscaping repair, stucco and paint, new circuits or rewiring found to be needed, and utility charges that the electrician does not collect. The range also assumes a normal home, not a multi-unit building.
What moves the price
| Factor | Effect | Range |
|---|---|---|
| One 400A service or two 200A panels | A national cost site says two 200A panels can be cheaper when the utility requires placement at the back of the property | |
| Trenching for service lines | Can add several thousand dollars, especially at 400A (national data) | |
| Utility requirements and lead time | The utility approves the service size and meter equipment, which can change both cost and schedule | |
| Number of panels and circuits to move | More panels mean more breakers, feeders and labor | |
| Panel location | Relocating a panel runs $1,000 to $4,000 in national data |
Questions people ask
Do I need 400 amp service for an EV and a heat pump?
Usually not. Most single-family homes carry an EV charger and a heat pump on 200 amps after a load calculation, often with a load-management device. Look at 400 amps when the house is large, has a pool, an ADU, and several heavy loads all at once.
Is two 200 amp panels better than one 400 amp service?
It can be cheaper, because a national cost site notes that two 200-amp panels can cost less when the utility wants equipment placed at the back of the property. It depends on the utility rules and the layout. Ask the electrician to price both.
Why does 400 amp work take so long to schedule?
The utility has to approve the larger service and may need to change its equipment. That review, plus meter work, often sets the pace, not the electrician. Ask for a written timeline that names which steps the utility controls, and what happens if its review runs long.
Related
400 amp electrical service: who needs it
Most homes do not need 400 amp service. It fits large houses or all-electric homes whose load calculation…
Electrical panel upgrades in Southern California: when and how
A panel upgrade replaces the main breaker box, and most SoCal homes that need one are moving from 60 to…
What a 200 amp panel upgrade costs in Southern California
The price of a 200 amp panel upgrade in SoCal is typically $2,500 to $4,500 with the permit, as of October…
How much do breaker box replacement and electrical panel replacement cost?
Replacing a breaker box with a new electrical panel typically costs $2,500 to $4,500 installed, including…
Who files, who pays and who to call in a service upgrade
The four parties in a panel or service upgrade, what each files, what each pays and what to say when you call.
Load calculation explained in plain English
The 220.83 method step by step with a worked example for a 1,800 sq ft home, and the 220.87 option based…
Commercial
Panel upgrade cost estimator
Pick your panel, target size and site conditions to get a typical SoCal range.