400 amp electrical service: who needs it
Most homes do not need 400 amp service. It fits large houses or all-electric homes whose load calculation passes 200 amps, and the utility is part of the job.
- Typical SoCal range: $8,000 to $12,000
- Utility sign-off: Needed
- Conductors (one city chart): 400 kcmil

Check the load before you pick the size
A 400 amp service is a big step up, and most people who ask about it do not need it. The size of a service is set by a load calculation, not by how many appliances a house has. The electrician adds up the square footage, the small-appliance and laundry circuits, fixed appliances, heating and cooling, and any EV charger. The code then applies demand factors, because everything is never on at once. If the result is under 200 amps, 200 amps is the answer. The load calculation guide shows the steps.
When the total passes 200 amps
The homes that land at 400 amps tend to look like this:
- 3,500 square feet or more, with electric heat or a heat pump on each floor,
- an ADU or guest house sharing the main service,
- a pool or spa, with its pump, heater and lights,
- two or more Level 2 EV chargers running at once,
- an electric range, electric dryer and electric water heater.
Even then, there are ways to stay at 200 amps. A smart panel or a charger that shares power can cap the load. The 2023 NEC lets an energy management system limit the load on a service in some cases. Whether your inspector and utility accept that is a local call, so ask before relying on it.
What changes at 400 amps
The service is bigger in every part.
| Part | What changes |
|---|---|
| Service conductors | Heavy copper or aluminum, sized for 400 amps |
| Conduit and mast | Larger. One city chart lists 400 kcmil conductors in 2-1/2 inch conduit |
| Grounding | A larger grounding electrode conductor, 1/0 AWG in that same chart |
| Meter | A larger socket, and possibly a different meter type |
| Panels | One 400 amp panel, or a disconnect feeding two 200 amp panels |
| Utility | May need a bigger service lateral or transformer |
The chart is from Laguna Niguel’s January 2026 handout. Your city and utility set their own tables, so treat these as examples.
The utility is part of the job
The meter and the lines up to it belong to the utility. For 400 amps, the utility planner reviews the request and decides what its side needs. That might be nothing, a larger service lateral, or a transformer change. SCE, SDG&E and LADWP each run their own process, and each reply sets the schedule. Do not assume a date until the utility has answered. The utility coordination guide explains how the planner step works, and the meter and service mast page covers the equipment on your side.
Timing is where this job differs most from a 200 amp swap. A swap is often a one-day job. A 400 amp upgrade can take weeks or months when the utility has to build something. No fixed lead time is published for house service upgrades, so ask your utility planner.
Cost
The typical SoCal range is $8,000 to $12,000 as of October 2026. It includes the 400 amp service, the meter socket and the panel or panels. It does not include utility fees, trenching for an underground lateral, stucco or landscape repair, or a new circuit run to a far outbuilding. Read the 400 amp cost page for the factors, and try the cost estimator for a first number.
Permit and inspection
A 400 amp service needs an electrical permit and a city inspection. Many cities also want to see the utility service order before they issue the permit. Plans often include a single-line diagram showing the service, the panels and the load calculation. The permit and inspection page covers the steps.
Surge protection and disconnect
A new 400 amp service for a house also needs a Type 1 or Type 2 surge protective device under section 230.67, and an outdoor emergency disconnect under 230.85 on one- and two-family homes. California’s 2025 Electrical Code took effect January 1, 2026 and is based on the 2023 NEC.
Questions to ask the electrician
- What load calculation supports 400 amps, and can I see it?
- Would a smart panel or load sharing keep me at 200 amps?
- Which utility steps are included, and who schedules them?
- Is the quote for one panel or two, and where do they mount?
Questions people ask
Do I need 400 amp service for two EV chargers and a heat pump?
Usually not. A load calculation often fits two chargers and a heat pump inside 200 amps, especially with a charger that shares power or a smart panel that limits load. 400 amps becomes likely when you add a large home, a pool, an ADU and an electric range on top. The calculation decides it.
Is 400 amp service two 200 amp panels?
Often, yes. A common layout is one 400 amp service feeding a main disconnect and two 200 amp panels, or a main panel with a large subpanel. Another layout uses one 400 amp panel. Which one is used depends on space, what the utility allows and what the inspector accepts.
Will the utility have to upgrade anything for 400 amps?
Possibly. The utility can require a larger service lateral, a new transformer or a different meter type. Whether it does depends on your neighborhood's equipment. The electrician contacts the utility service planner at the start, and that answer drives both cost and timing.
How much more is 400 amps than 200 amps?
As of October 2026 the typical SoCal range is $8,000 to $12,000 for 400 amps, compared with $2,500 to $4,500 for a 200 amp swap. The gap comes from heavier wire and conduit, a larger meter setup, one or two panels, and utility work. A meter or underground change adds more.
Keep reading
Electrical panel upgrades in Southern California: when and how
A panel upgrade replaces the main breaker box, and most SoCal homes that need one are moving from 60 to…
How much does a 400 amp service upgrade cost?
Expect $8,000 to $12,000 for a 400 amp service upgrade, about triple a standard 200 amp swap. The total…
200 amp panel upgrade: what changes and when you need it
A 200 amp panel upgrade swaps your old main panel for a new one and, usually, the wire from the meter to…
Meter, meter socket and service mast
The mast and meter socket are yours, and the meter and the wires to it belong to the utility. Moving or…
Load calculation explained in plain English
The 220.83 method step by step with a worked example for a 1,800 sq ft home, and the 220.87 option based…
Who files, who pays and who to call in a service upgrade
The four parties in a panel or service upgrade, what each files, what each pays and what to say when you call.
Panel upgrade cost estimator
Pick your panel, target size and site conditions to get a typical SoCal range.
Send a photo, get a range.
Share your ZIP and a photo of your panel. Your request goes to a licensed partner electrician, who contacts you.
Get this quoteAurion Electric is a referral service operated by Roviq LLC. Electrical work is done by a licensed partner electrician.