A subpanel installed in SoCal typically costs $1,200 to $2,800, including the feeder, breakers and permit. This range is an estimate, not a published price, and the real number depends mostly on the distance from the main panel.

Typical SoCal range, October 2026
$1,200 to $2,800
subpanel, feeder, breakers, permit. This is a desk estimate, not a quote.
Basis: estimate. The $1,200 to $2,800 range is a desk estimate for a typical SoCal job as of October 2026. There is no published SoCal subpanel price list. Two points help bracket it. A national cost site lists subpanel materials at only $100 to $400, which is a floor, not an installed price. Fixr’s national guide also says the full cost of a subpanel is similar to a standard panel installation, which it prices at $1,200 to $1,800 for 100 amps and $1,800 to $4,500 for 200 amps, labor included.
How a subpanel is sized and wired is on the subpanel installation page.
What you are paying for
The panel itself is cheap. The cost is the feeder, the labor and the inspection. A typical job includes:
- A subpanel sized for the loads
- A feeder from the main panel (wire, conduit, a breaker)
- Grounding and bonding that follow code for a separate building
- A first set of breakers
- The permit and inspection
The distance question
A subpanel inside the house, ten feet from the main panel, is a small job. A subpanel in a detached garage or ADU is a different job, because the feeder must go underground or overhead across the yard. The trenching, conduit and wire can cost more than the panel. Ask each bidder for the feeder length they assumed.
When the main panel is the problem
A subpanel adds capacity on paper, but the main panel and the service still have to carry the load. If the main panel is full or small, the electrician may suggest a panel upgrade first. That is why the two jobs are often bundled. A load calculation shows whether the existing service can feed a new subpanel. See the ADU electrical guide for how that works with a second dwelling.
Special cases
- Backup power. A subpanel for critical loads is its own job. See critical-loads subpanels.
- EV charging in a detached garage. The feeder work often decides the cost. Compare against the EV charger cost page.
- Remodels and ADUs. Plan the subpanel size for future loads so you do not rewire later. See ADU and remodel electrical.
Putting the sources side by side
| Source | What it covers | Figure |
|---|---|---|
| National cost site | Subpanel materials only | $100 to $400 |
| Fixr, national | Full panel installation, 100 amps (a subpanel costs about the same) | $1,200 to $1,800 |
| Fixr, national | Full panel installation, 200 amps (a subpanel costs about the same) | $1,800 to $4,500 |
The range on this page, $1,200 to $2,800, is a desk estimate that starts at the 100-amp installed figure. Materials are a small slice, so most of the spread comes from feeder length and trenching, not from the panel.
Permits, and when the utility is involved
A subpanel is a permitted job. The fee depends on your city, and an ADU adds its own review. Use the city pages or the county hubs, such as Orange County and San Bernardino County. A subpanel on the customer side of the meter usually does not need utility work unless the main service changes.
How to compare quotes
- Ask for the subpanel size in amps and the number of spaces.
- Ask for the feeder length, wire size and conduit type.
- Ask whether trenching and concrete cutting are included.
- Ask whether the price assumes the main panel has room.
- Ask what the permit fee is and who pays it.
What is not included
Trenching by a separate contractor, concrete or landscaping repair, drywall patching, a main panel upgrade, and the circuits you add later. The range above is for a normal single-family lot.
What moves the price
| Factor | Effect |
|---|---|
| Distance from the main panel | Longer feeders need more wire and conduit, and the cost rises with every foot |
| Detached building or trenching | A detached garage or ADU needs an underground feeder, which is usually the biggest single add |
| Subpanel size | Larger subpanels need heavier feeder wire and a larger breaker in the main panel |
| Room in the main panel | If the main panel has no space or capacity, the job may turn into a panel upgrade |
| Number of circuits to start | Each new circuit adds breakers, wire and labor |
Questions people ask
Do I need a subpanel or just more breakers?
If the main panel has free spaces and enough capacity, new circuits can go in it. A subpanel helps when a garage, ADU or shop is far away, or when the main panel is full. A short feeder to a subpanel is usually cheaper than running many separate long circuits.
Is the $1,200 to $2,800 range exact?
No. It is a desk estimate. Fixr's national guide lists subpanel materials alone at $100 to $400 and says the full cost is similar to a standard panel installation, which it prices at $1,200 to $1,800 for 100 amps and $1,800 to $4,500 for 200 amps. That points to the same zone, but get at least two written quotes.
Does a subpanel need a permit?
Yes, in general. A new feeder and panel are electrical work that cities permit and inspect. Check your city page for the office and process. The inspection confirms the feeder size, grounding and breaker settings before the wall is closed up.
Related
Subpanel installation: when it fits and how it is wired
A subpanel is a second breaker box fed from your main panel, and it adds circuit space for a garage, ADU…
Electrical panel upgrades in Southern California: when and how
A panel upgrade replaces the main breaker box, and most SoCal homes that need one are moving from 60 to…
What a 200 amp panel upgrade costs in Southern California
The price of a 200 amp panel upgrade in SoCal is typically $2,500 to $4,500 with the permit, as of October…
How much does it cost to install a Level 2 EV charger at home?
A Level 2 EV charger install in Southern California typically costs $1,000 to $2,000 for the new 240-volt…
ADU electrical requirements
Subpanel or new service, feeder, meter choice, EV and heat pump loads, and typical cost for a backyard or…
ADU and remodel electrical work
Most ADUs get power from a subpanel fed by the main house panel, and a load calculation sets its size. A…
Critical loads subpanel for a battery or generator
A critical loads subpanel is a small second panel that holds only the circuits you want during an outage…