Power from LADWP
Commercial · Los AngelesCommercial electrical work in Los Angeles
Los Angeles businesses deal with two city agencies on one job. LADBS permits and inspects the wiring, and LADWP, the city utility, sets the rate schedule and releases the meter.

- 30 kWLADWP small commercial schedule A-1 covers facility demand under
- June through SeptemberLADWP summer High Season billing months
- up to $4,000LADWP commercial Level 2 charger rebate, non-equity, per charger (applications closed)
- up to $20,000LADWP DC fast charger rebate, 50 to 149 kW non-equity tier, per charger (applications closed)
Electric utility
LADWP
Los Angeles Department of Water and Power (LADWP)
City-owned utility. Service upgrades and meters go through the city, not SCE. Utility site
Order of steps in LADWP territory (from the LADWP Guide to Electric Service, March 2024): get a Meter Spot Sheet from the ESR before the LADBS inspection; the electrician pulls the LADBS electrical permit and passes the LADBS inspection; LADBS electronically sends a release to LADWP, and the service data on the release (address, main switch size, phase, voltage) must match the permit; LADWP inspects, then schedules the meter and any line work. The guide says to allow several days for the LADBS release to reach LADWP. For single-family service of 320 to 400A, LADWP asks for a Residential Service Planning Information Form. LADWP says to contact an ESR at least two weeks before installing a home charger so it can check the transformer and service lines.
Electrical permit fees in Los Angeles
City fee lines. Commercial permits can also carry plan check and fire review.
| Item | Fee |
|---|---|
| Minimum electrical permit LADBS Electrical Permits Fee Schedule (PC-ELEC.FeeSched01, Rev 12/2016), the version LADBS still posts. This is the revision LADBS currently posts. | $90 for 2 or more items, or 1 item over $55; $55 for 1 item under $55 |
| Permit issuing fee Applies when the permit subtotal is over $90. A 3% surcharge and a 6% systems surcharge are added to the permit subtotal. | $23.00 |
| Service, 0 to 200 amps | $16.00 |
| Service, 201 to 600 amps | $34.00 |
| Panelboard or subpanel, 0 to 200 amps | $16.00 |
| General-use branch circuits, 120V, first 10 Circuits 11 to 40 are $16.00 each. Used for a new EV charger circuit. | $17.00 each |
Taken from the city's fee page. Commercial valuation-based fees and plan check can apply on top. Confirm at the permit counter.
Two city agencies, one release
In Los Angeles the building department and the power company are both city departments, and a new or changed service needs both to sign off. The Los Angeles Department of Building and Safety (LADBS) inspects the wiring. It then sends a release to LADWP by computer. LADWP’s service guide says the service data on that release, such as address, main switch size, phase and voltage, must match the electrical permit, and that the release can take several days to arrive.
LADWP also inspects the metering equipment and wants a service application on file. It will not schedule its own crews until the inspections and releases are in. So a panel change that passes the city inspector can still leave a business without power if the paperwork does not agree.
Where the request goes depends on size. LADWP says commercial service equipment rated 400 amps or less, single phase, goes to the area Electric Service Representative, with a site plan, a single-line diagram, a load schedule and the Service Planning Information Form. Larger or three-phase services go through service planning. For a big job, LADWP’s guide asks for plans four to six weeks before the building is finished so cable and transformers can be set in time. See commercial panel and service upgrades for how the utility step fits into a schedule.
Which LADWP rate schedule a business lands on
LADWP prices commercial customers by demand, not by building type. Schedule A-1 covers small commercial accounts with facility demand under 30 kW. Schedules A-2 and A-3 apply at 30 kW and above, depending on whether LADWP delivers at 4.8 kV or 34.5 kV. A customer moves up when maximum demand reaches or exceeds 30 kW in any three billing months in the previous 12, and moves back to A-1 if demand falls below 30 kW.
Summer rates apply from June through September, and winter rates from October through May. Time-of-use pricing has high peak, low peak and base periods. This is why a restaurant adding a second oven line or a retailer adding chargers should ask for a load calculation before ordering equipment. A jump over 30 kW changes the bill, not just the panel.
LADWP also publishes monthly EV commercial charging service rates in three customer categories, EVA1 through EVA3, updated each quarter. Demand charges are still part of them, so a charger site is not free of demand billing. The LADWP programs guide covers the household side.
Express permit or plan check at LADBS
LADBS splits electrical work into express permits and plan check. Its express list covers installations under 600 volts and up to 400 amps of total load in existing office, retail and residential buildings, for non-engineered wiring. Plan check is expected for loads above 400 amps, equipment rated 600 amps or more, installations over 600 volts, hazardous locations, exit, egress and security lighting, and systems such as fire alarm and standby power. LADBS also publishes document requirements for commercial and industrial tenant improvements. The details are on the tenant improvement electrical page.
Which path a job takes can change the schedule by weeks, so ask LADBS before the permit is filed. The permit guide explains how permits work across the region.
Fire department review
The Los Angeles Fire Department reviews new construction, change of use and remodeling projects in buildings with a state fire marshal occupancy, and its engineers review fire alarm systems. A lighting retrofit is usually outside that, but a change to exit lighting, alarm devices or panels can bring a second reviewer into the job. The LED lighting retrofit page covers when lighting work needs a permit.
Charger rebates are closed for now
As of October 2026, LADWP’s commercial EV charger rebate says applications are closed, with the next enrollment planned for November 2026. The last published amounts were up to $4,000 per Level 2 charger for workplace and non-equity sites, up to $5,000 at equity sites for multifamily or public use, and DC fast tiers from $20,000 to $100,000 for non-equity sites. Chargers must be permanently installed by a licensed electrical contractor. The page lists a limit of 80 Level 2 rebates per premises and 20 DC fast rebates. Read the commercial EV charging page before planning a project around a rebate.
What to send
Commercial electrical work in Los Angeles is available through the partner electrician. To start, send the building type, the address, whether you are the tenant, the owner or the property manager, and what is wrong or planned. A photo of the main panel and the meter helps. Start from the commercial hub or the Los Angeles residential page, and see the county overview for other cities nearby.
Send three things. Get a call.
Share the building, the job and a deadline. Your request goes to a licensed partner electrician, who contacts you about the building, the load and the permit path.
Commercial electrical work is available through the partner electrician.
- The buildingType of business, address and rough size.
- Who you areOwner, tenant, property manager or HOA board.
- The jobWhat is wrong or planned, and any deadline such as a lease date or inspection.
Commercial work in Los Angeles
Commercial electrical service and repair
Commercial EV charger installation for workplaces and retail
Commercial panel and service upgrades
Electrical maintenance agreements for commercial buildings
Exit signs and emergency lighting for businesses
What a property manager needs from an electrician
Electrical work in HOA and condo common areas
Commercial LED lighting retrofits and Title 24
EV charging for multifamily buildings and HOAs
Commercial electrical work in Orange County
Parking lot lighting for California businesses
Electrical work for restaurants and retail stores
Standby generator installation for businesses
Tenant improvement electrical: what a build-out needs
Warehouse and industrial electrical work in Ontario and the Inland Empire
Questions people ask
Does my Los Angeles shop pay SCE or LADWP for electricity?
Most addresses inside the City of Los Angeles are served by LADWP, but a few edge areas and several neighboring cities are on SCE. Your bill shows which utility serves the meter. The answer matters because LADWP rate schedules, rebates and service steps are different from SCE's, and the two utilities do not share forms.
What happens if my business grows past 30 kW of demand?
LADWP moves a small commercial account from schedule A-1 to A-2 or A-3 when maximum demand reaches or exceeds 30 kW in any three billing months within the past 12 months. A-2 and A-3 also depend on the voltage LADWP delivers. Adding ovens, compressors or chargers can push a space over that line, so ask for a load calculation first.
Can a tenant improvement electrical permit be pulled at the LADBS counter without plan check?
Sometimes. LADBS lists express permits with no plan check for non-engineered wiring under 600 volts and up to 400 amps of total load in existing office and retail buildings. Larger loads, equipment rated 600 amps or more, hazardous locations, exit lighting and fire alarm work generally go to plan check. Confirm the path with LADBS before you schedule.
Is there money for commercial EV chargers in Los Angeles right now?
Not today. LADWP's page says commercial EV charger rebate applications are currently closed, with the next enrollment planned for November 2026. Its dashboard, updated August 19, 2026, lists the new fiscal year funds as pending release. Rebates are paid on chargers installed by a licensed electrical contractor, so do not buy equipment on the assumption of a rebate.
Does an alarm or exit light change need fire department review?
It can. The Los Angeles Fire Department reviews fire alarm systems and remodeling projects in buildings with a state fire marshal occupancy, and LADBS lists exit and egress lighting among the items that need plan check. Ask which agency has to approve the plans before the work starts, because a missed review can hold up the final inspection.
Related
Commercial
Electrician in Los Angeles
Electrical work in Los Angeles County
Los Angeles County has more electric utilities, permit offices and housing eras than any other SoCal…
Tenant improvement electrical: what a build-out needs
In a lease build-out, the electrician works from the landlord's service up to the last outlet. The code…
Commercial panel and service upgrades
A commercial service upgrade has two jobs: the electrician's work inside the building and the utility's…
Commercial EV charger installation for workplaces and retail
A business charger project is mostly an electrical capacity question. The charger is the small part; the…
Commercial LED lighting retrofits and Title 24
Swapping a warehouse or office to LED is regulated work in California when the change touches 10 percent…
LADWP EV charger rebate and home programs: the terms and the order of steps
LADWP's charger rebate, meter rebate and EV rate discount, who qualifies, and how the city permit and…