What a property manager needs from an electrician
A property manager gets better electrical work by sending a complete request, knowing who pays, giving tenants proper notice and asking for the right paperwork. This page is the checklist.

- 24 hours in writing is presumed reasonable (Civil Code 1954)Entry notice to a dwelling
- 6 days before entry is presumed reasonableMailed notice
- Leases signed, extended or renewed on or after July 1, 2015 (Civil Code 1947.6)Residential tenant EV request
- Properties with 50 or more parking spaces (Civil Code 1952.7)Commercial tenant EV request
What to send for a request
A request with these items gets a faster, more accurate answer:
- Building address, unit number and building type (apartments, small commercial or mixed use).
- Who you are: manager, owner or tenant, and who approves cost.
- What is wrong, since when and which outlets, lights or breakers it affects.
- Photos of the panel with the door open, the panel label and the problem.
- Access details: lockbox, tenant phone, time windows, parking.
Commercial electrical work is available through the partner electrician. Send the request through the quote form.
Tenant or owner
The lease and the cause settle who pays. Building systems such as the service, house meters, shared panels and common lighting usually fall to the owner. A tenant may owe for damage they caused. In a commercial lease, the repair and alteration clauses and any tenant improvement terms govern, and the service and repair page explains what each kind of call involves. In an HOA, the split is different, and the HOA common area page covers it.
Tenants can also start work. A residential tenant whose lease was signed, extended or renewed on or after July 1, 2015 can request a charger at an assigned space under Civil Code 1947.6, unless an exception applies such as fewer than five parking spaces. Commercial tenants have similar rights under Civil Code 1952.7 at properties with 50 or more spaces. The multifamily and HOA EV page has details.
Access and notice
For a dwelling, Civil Code 1954 allows entry for necessary or agreed repairs. The landlord gives written notice with the date, approximate time and purpose, and entry should be during normal business hours. Twenty-four hours is presumed reasonable notice. Mailing it at least six days ahead is also presumed reasonable. Emergencies need no notice. Entry cannot be used to harass a tenant. Your lease and local rules may require more, so build their notice period into the schedule.
Also plan the day: power-off notices for shared panels with the exact breakers and duration, key and elevator rules, and photos of the panel before and after.
Common issues
- Breakers that trip, and outlets that went dead after a tenant added equipment.
- Failed fixtures and exit lights in common areas.
- Old panels in older buildings. The panel upgrade information explains what the utility and city add to a bigger job.
- Lighting upgrades. The LED retrofit page lists when Title 24 applies.
For routine checks, an electrical maintenance agreement puts them on a schedule.
Permits
Panel replacements, service changes, new circuits and chargers need permits. Like-for-like outlet or switch swaps often do not, but cities differ. Ask the electrician to state in writing whether each job needs a permit and who pulls it, then keep the permit number and final sign-off in the building file. The permit guide covers the basic path.
Documents a manager can ask for
This list is what to request, not what any electrician has promised to provide.
- License: the CSLB license number. Check classification, status, bond and workers’ compensation on the CSLB record, and compare the business name with the proposal. The license check guide walks through it.
- Crew certification: under Labor Code 108.2, workers for a C-10 contractor must hold a state electrician certification unless they are registered apprentices or trainees or exempt.
- Insurance: a certificate of insurance, if your agreement or the owner requires one, with limits the owner sets and the right certificate holder named.
- Quote: written scope, materials, permit fees and exclusions. The quote checklist lists the lines.
- Close-out: permit number, final inspection sign-off, photos and a short description of the cause for repair calls.
Keep one folder per building: panel schedule, last inspection, permit finals, certificates, equipment warranties and any tenant-requested chargers. A refinance, insurance renewal or sale tends to ask for it.
What the work covers
| Item | What it involves |
|---|---|
| Repair requests | Dead circuits, tripping breakers, failed fixtures and outlets in units and common areas. |
| Common area systems | House meters, lighting, gates, meter rooms and shared panels. |
| Tenant turnover | Safety checks, outlet and fixture repairs and lighting before a unit is re-let. |
| Upgrades | Panel and service changes, EV charger requests and added circuits for equipment. |
| Records | Permit finals, panel photos and work orders kept per building. |
Send three things. Get a call.
Share the building, the job and a deadline. Your request goes to a licensed partner electrician, who contacts you about the building, the load and the permit path.
Commercial electrical work is available through the partner electrician.
- The buildingType of business, address and rough size.
- Who you areOwner, tenant, property manager or HOA board.
- The jobWhat is wrong or planned, and any deadline such as a lease date or inspection.
Commercial electricians by city
Questions people ask
What should I send an electrician for a repair request?
Send the address, unit number, building type, who you are (manager, owner or tenant), what is wrong and since when, which outlets, lights or breakers are affected, and photos of the panel and the problem. Add access details such as lockbox, tenant contact and preferred time window. A complete request lets the electrician judge urgency and bring the right parts.
How much notice must I give a tenant before an electrician enters?
Civil Code 1954 lets a landlord enter a dwelling for listed reasons, including necessary or agreed repairs, with written notice stating the date, approximate time and purpose. Twenty-four hours is presumed reasonable. Mailing the notice at least six days ahead is also presumed reasonable. No notice is needed for an emergency. Your lease and local rules may add more.
Who pays for electrical work, the owner or the tenant?
The lease and the cause decide. Work on building systems, such as service, meters and shared panels, usually falls to the owner. Damage or misuse by a tenant may fall to the tenant. For commercial leases, the repair and alteration clauses govern. Ask the owner or the lease for the rule before you authorize the work.
Do I need a permit for a repair in a rental unit?
Replacing a panel, adding circuits, changing a service or installing a charger needs a permit. Swapping a like-for-like outlet or switch often does not, but rules vary by city. Ask the electrician to state in writing whether each job is permitted. A permit also creates an inspection record that protects the owner.
What documents should I ask an electrician for?
Ask for the license number to check on the CSLB site, a certificate of insurance if the owner or your agreement requires one, a written scope and quote, permit numbers and the final inspection sign-off. Whether a given electrician supplies each item is for you to confirm. Compare the business name across all of them.
Related
Commercial
Commercial electrical service and repair
A business electrical problem is either inside your meter, where an electrician fixes it, or outside it…
Electrical maintenance agreements for commercial buildings
A maintenance agreement is a written list of electrical checks, how often they happen and what happens…
Electrical work in HOA and condo common areas
In a California HOA, the association repairs common area electrical equipment unless the governing…
EV charging for multifamily buildings and HOAs
In a California HOA, the board cannot unreasonably block an owner's EV charger, and in many rentals the…
Commercial panel and service upgrades
A commercial service upgrade has two jobs: the electrician's work inside the building and the utility's…
How to verify an electrician's license in California
A five-minute CSLB check: license status, C-10 class, bond, workers' comp, and the contract terms the law…
What an electrical quote should include
Twelve lines every written electrical quote needs, so three bids can be compared on the same job.
Electrical permits in Southern California: what needs one and who pulls it
What needs an electrical permit, who pulls it, what the inspector checks, and what happens if the work was…