Skip to content
Guide · 6 min · Updated 2026-10-31

LADWP EV charger rebate and home programs: the terms and the order of steps

As of October 30, 2026, LADWP is taking applications for its home EV charger rebate: up to $1,000 for a qualifying charger and its installation, up to $1,500 for income-qualified customers, plus $250 for a separate EV meter. Book a service assessment before you install.

LADWP is a city-owned utility. Its programs are separate from SCE’s, so Charge Ready Home does not apply to an LADWP account. The program terms below come from LADWP’s Residential EV Charger Rebate Program page, read on October 30, 2026.

Status on October 30, 2026

Program Status What the page shows
Home EV charger rebate Open Apply Today button; no deadline, closure or waitlist notice
Dedicated EV meter rebate Open Same application; pick the meter option
EV rate discount Open Needs a separately metered charger on a time-of-use rate
Used EV rebate Open Apply Today button; rolling deadline of 12 months from purchase
Panel upgrade rebate None listed See the Panels section below

LADWP can close or change a program without notice, so read the page again on the day you apply.

The rebates

Item Amount Notes
Home EV charger Up to $1,000 For buying and installing a qualifying Level 2 charger
Income-qualified add-on Extra $500, up to $1,500 total Senior Citizen/Disability Lifeline or EZ-SAVE customers
Dedicated EV meter $250 Pick the meter option on the application
Used EV rebate Up to $1,500; up to $4,000 for EZ-SAVE or Lifeline homes Separate program for qualifying used EVs and plug-in hybrids, with its own terms

An older LADWP news release quoted $750 for the charger. The current page says $1,000, so ignore older numbers.

Who qualifies

The account holder’s name must be on the bill, and the account must have an active LADWP electric meter on a residential rate plan. The charger must be a Level 2 unit on LADWP’s qualifying product list. The page lists no application deadline, which can change.

The rate discount

If the charger sits on its own meter, on a time-of-use rate, LADWP takes $0.025 per kWh off base period charges. The page lists a $10 monthly minimum on that meter and no service charge. LADWP has no stand-alone EV rate, so the discount works through the separate meter. A second meter means a second service connection, with its own electrician work and permit. Whether that pays back depends on how much you charge. The time-of-use guide explains the trade-offs, and the dedicated meter rebate softens the upfront cost.

Before you install: the service assessment

LADWP asks for a service assessment before the charger goes in. Use its “Find the Right Person” page with your address and contact the representative listed under Residential Electric Vehicle. Electrical service for the charger is requested through the Residential EV Charger Request form. LADWP’s guide says to contact an Electrical Service Representative at least two weeks before installing a home charger, so the utility can check the transformer and service lines.

The order of steps

  1. Book the service assessment and file the charger request form.
  2. If the service is growing, get a Meter Spot Sheet from the LADWP representative before the building inspection.
  3. The electrician pulls the Los Angeles Department of Building and Safety permit.
  4. The work is installed and inspected.
  5. LADBS sends a release to LADWP. The service data on it (address, main switch size, phase, voltage) must match the permit.
  6. LADWP inspects and schedules the meter and any line work.
  7. Apply for the rebate online with your LADWP account, attaching PDF or JPEG copies of the supporting documents, or by mail. The online form times out after 30 minutes of inactivity.

For a single-family service of 320 to 400 amps, LADWP asks for a Residential Service Planning Information Form. The panel timeline guide compares this with SCE and SDG&E.

What to bring to the application

Have the account number and the name on the bill ready, the charger model on LADWP’s qualifying list, the installer’s invoice showing the charger and the installation labor, and the permit and final inspection record if the application asks for them. If you installed a separate meter, pick the meter option so the $250 is added. Keep PDF or JPEG copies of everything, because the online form lets you attach files only in those formats. Read the page again on the day you apply, since LADWP can change the terms without notice.

Panels

LADWP’s EV charger page lists no panel rebate. If a charger forces a panel upgrade, the cost sits on top of the charger. The panel upgrade cost page gives a typical SoCal range as of October 2026, and the load calculation may show you can avoid the upgrade. See the Los Angeles page for permit office details.

Fire season and outages

LADWP is not an SCE-style shutoff utility, but in January 2025 it said local fire authorities may ask it to cut power. It told customers in its Tier 2 and Tier 3 fire areas to be ready for outages longer than 48 hours. Before lines in high-risk zones are re-energized, crews patrol the entire circuit. See the PSPS explainer for how shutoffs work across utilities.

Other city utilities

Burbank, Glendale, Pasadena, Anaheim and Riverside each run their own rebate programs, with their own amounts and rules. The city utility rebates guide lists them. County-wide context is on the Los Angeles County page.

Questions people ask

How much is the LADWP EV charger rebate?

Up to $1,000 for buying and installing a qualifying Level 2 home charger. Customers in the Senior Citizen/Disability Lifeline or EZ-SAVE programs get an extra $500, for up to $1,500. A separate $250 applies if you install a dedicated meter for the charger. LADWP's page shows an Apply Today button and lists no deadline or closure as of October 30, 2026.

Does the account have to be in my name?

Yes. The account holder's name must be on the bill, and the account must have an active LADWP electric meter on a residential rate plan. The charger must be a Level 2 unit on LADWP's qualifying product list. Renters need to make sure the account holder is the one applying.

Do I need a permit for the charger?

Yes, a hard-wired charger or a new 240-volt circuit needs a Los Angeles Department of Building and Safety electrical permit and inspection in the city of Los Angeles. LADWP also asks you to book a service assessment first and file its Residential EV Charger Request form. Other cities served by LADWP have their own permit offices.

Is there an LADWP rebate for a panel upgrade?

LADWP's EV charger rebate page lists no panel upgrade rebate as of October 30, 2026, and LADWP's residential programs and rebates index shows no panel rebate. Burbank, Glendale, Pasadena, Anaheim and Riverside, which run their own utilities, each have their own panel or charger rebates. Ask LADWP before counting on one.

Keep reading

Call (909) 552-7102Quote