Power from Anaheim Public Utilities

Commercial · Anaheim

Electrical work for Anaheim businesses

Every Anaheim business buys power from Anaheim Public Utilities, a city department, so SCE business rates and SCE programs do not apply. That holds from Resort District hotels to shops in Anaheim Canyon.

Get a quote

An open commercial ceiling with conduit runs, cable bundles and LED troffers during a tenant improvement
  • 1 year, with an extension on requestCity plan check for a tenant improvement stays active for
  • up to $3,500APU public-access charger rebate, per station, in the program agreement
  • up to $1,500APU reimbursement of city plan check fees under the same agreement, per site
  • the Anaheim Resort Specific PlanResort District plans reviewed against

Electric utility

Anaheim Public Utilities

Anaheim Public Utilities

City-owned utility. Service upgrades and meters go through the city, not SCE. Utility site

Building department

City of Anaheim Building Division (Planning and Building Services)

714-765-5153 · Permit page

Per APU's Residential Electrical Panel Upgrade page: call APU Customer Service at 714-765-3300; a utility inspector contacts the customer within 2 to 3 business days to approve the panel location; APU issues a meter spot report that goes to the building inspector; the city building inspector approves the panel and wiring first; then the utility and meter shop inspection is booked with the APU electrical inspector (714-765-6847); a crew energizes the panel within 3 to 5 business days after both inspections pass (the EV charger checklist says 2 to 5). A residential panel upgrade also needs an electrical permit from the Building Division, which can be pulled online.

Electrical permit fees in Anaheim

City fee lines. Commercial permits can also carry plan check and fire review.

ItemFee
Service, meter or panel, 600 V or less, up to 200 amps$126.00
Service, meter or panel, over 200 up to 500 amps$167.00
Minimum electrical permit fee$167.00
Supplemental permit fee$42.00

Taken from the city's fee page. Commercial valuation-based fees and plan check can apply on top. Confirm at the permit counter.

A city utility changes the first call

Most online advice about business power assumes SCE, with SCE rate tiers and an SCE planner. None of it applies in Anaheim. The city runs Anaheim Public Utilities (APU), and it serves every address, so the first call for a larger service, a new meter or a second panel goes to APU. The city’s tenant improvement guide lists the utility engineering groups among the reviewers of tenant improvements and changes of use, alongside the Building Division, which checks building, electrical, plumbing and mechanical code compliance, Title 24 energy rules and accessibility. The city’s electric rate schedule page lists a General Service tariff, GS-1, as a PDF, and APU can tell a business which schedule its load falls under. See panel and service upgrades for how that call fits the schedule.

A city plan check stays active for one year according to the tenant improvement guide, and an extension can be requested before it expires. That matters for a build-out that waits on a lease, a landlord letter or a long equipment order. The guide is an older document, so ask the Building Division for current forms and fees at 714-765-5153.

Resort District, Platinum Triangle and Anaheim Canyon

Anaheim’s big commercial districts each have their own planning layer, and electrical work for signs, lighting and equipment yards gets reviewed against it.

  • Resort District. Building plans are reviewed for conformance with the Anaheim Resort Specific Plan, the chapter of the code, and the conditions of approval. Ask the city whether exterior lighting or sign circuits need planning sign-off before the electrical permit is filed.
  • Platinum Triangle. Under the mixed-use overlay, a final site plan has to conform to the overlay and the Platinum Triangle Master Land Use Plan before building, landscape or sign permits issue.
  • Anaheim Canyon. The Canyon is covered by its own specific plan, and its environmental review (EIR No. 348) is public. Plan check steps for the Canyon were not published as a separate checklist, so treat it like any commercial tenant improvement and ask the Building Division what applies.

For a tenant space, the tenant improvement electrical page lists the scope that usually goes into plans.

Charger rebates tied to the inspection

APU runs a public-access charger rebate. Its program agreement lists a maximum of $3,500 per station, a sub-meter allowance, and up to $1,500 for city plan check fees per site. The rebate is paid only after the required documents are in and the city has inspected the installation. Pages in circulation do not agree. An older APU page shows up to $5,000 per station, and the property manager guide says permit and plan check fees are waived at the counter, while another page says the city pays the application fee. Get the current numbers from APU in writing, and expect funds to run out. APU also has a fleet charger program for businesses. The commercial EV charging page covers load management, and the AB 1236 permit guide covers the state permitting rules.

Fire approval and certificates of occupancy

Anaheim Fire and Rescue’s Life Safety Section handles fire-code permits and inspections, and the business license packet is issued jointly by the Building Division and the Fire Prevention Bureau. The city says Fire Department approval may be needed before a Temporary Certificate of Occupancy, along with Public Works or Planning. An exit lighting or alarm item left open can delay an opening date, so put the fire inspection on the electrical schedule. For lighting work in an existing space, see LED lighting retrofits.

What to send

Commercial electrical work in Anaheim is available through the partner electrician. Send the building type, the address, whether you are the tenant, the owner or the property manager, and what is wrong or planned. A photo of the panel and meter helps. Start from the commercial hub, the Anaheim residential page or the Orange County overview.

For the rest of the county, see the Orange County commercial page. Lot lighting rules are on the parking lot lighting page.

Commercial request: Anaheim

Send three things. Get a call.

Share the building, the job and a deadline. Your request goes to a licensed partner electrician, who contacts you about the building, the load and the permit path.

Commercial electrical work is available through the partner electrician.

Start a commercial request

  1. The buildingType of business, address and rough size.
  2. Who you areOwner, tenant, property manager or HOA board.
  3. The jobWhat is wrong or planned, and any deadline such as a lease date or inspection.

Commercial work in Anaheim

Questions people ask

Who do I call for more power, SCE or the city?

Call Anaheim Public Utilities. Anaheim has its own electric utility, and SCE does not serve the city. The city's tenant improvement guide says utility engineering groups review tenant improvements and changes of use. Ask APU before the electrician sizes a new panel or service, because the utility's requirements decide the equipment.

Does APU pay for commercial EV chargers?

APU lists a rebate for chargers open to the public. In its program agreement the cap is $3,500 per station, with up to $1,500 for city plan check fees per site, and payment only after the city inspects the installation. Older pages show $5,000 per station, so get the current cap in writing and expect limited funds.

Do I need a building permit for a charger in an Anaheim parking lot?

Yes, an electrical permit is needed, and the city inspects the work. APU ties its rebate payment to a satisfactory city inspection, so an unpermitted install gets no money. APU's property manager guide also says permit and plan check fees are waived at the counter for charging stations, while another page says the city pays the application fee. Confirm which applies.

Do hotel and resort projects follow different rules in Anaheim?

Resort District projects are reviewed for conformance with the Anaheim Resort Specific Plan and conditions of approval before plans are approved. The Platinum Triangle has its own overlay, and site plans there must conform before building, landscape or sign permits issue. A signage or lighting change in either district can need planning approval first.

Can the fire department hold up my occupancy?

It can. Anaheim's certificate of occupancy page says the city may require Fire Department approval before a Temporary Certificate of Occupancy, along with approvals from Public Works or Planning. The business license packet is also issued jointly by the Building Division and the Fire Prevention Bureau. Plan the fire inspection in the electrical schedule.