Power from RPU
Commercial · RiversideWhat commercial electrical work involves in Riverside
Riverside Public Utilities prices a business by size: a flat rate under 20 kW, demand billing from 20 kW, and a time-of-use schedule from 150 kW. Which class you land in shapes the cost of adding load.

- 20 kW of demandRPU Schedule A flat rate applies below
- 150 kWRPU Schedule TOU applies at or above
- $0.06 to $0.10RPU lighting rebate rate, per kWh saved over one year
- up to $5,000RPU public-access charger rebate, per station
- $164City of Riverside commercial EV charger permit line, each (FY 2026/27)
Electric utility
RPU
Riverside Public Utilities (RPU)
City-owned utility. Service upgrades and meters go through the city, not SCE. Utility site
Building department
City of Riverside Building & Safety Division (Community & Economic Development Department)
(951) 826-5800 · Permit page
Before a new panel goes in, RPU offers a 'meter spot' site check to confirm where the panel can go (appointment window 9 a.m. to 2 p.m., nobody needs to be home). RPU's page lists an initial inspection fee of $98.00 and says the city approved a new electric fee schedule effective July 1, 2026. Standard fees listed: temporary power overhead $1,009.00, underground $1,268.00, disconnect/reconnect $1,198.00. Fees apply up to 200 amps; above 200 amps they are based on cost to serve. The electrician then applies for a panel upgrade permit through Building and Safety. Phone for RPU: (951) 826-5489. RPU's page does not describe a separate meter-release form.
Electrical permit fees in Riverside
City fee lines. Commercial permits can also carry plan check and fire review.
| Item | Fee |
|---|---|
| Electrical permit issuance fee (each) FY 2026/27 Schedule of Fees and Charges, effective July 1, 2026. Marked with a 14% surcharge added (10% General Plan Maintenance plus 4% Technology). | $41.00 |
| Electrical service 0 to 200A FY 2026/27 schedule, effective July 1, 2026. Service 201A to 1,000A is $160.00; over 1,000A is $352.00. | $90.00 |
| EV charger, residential (each) FY 2026/27 schedule, effective July 1, 2026. Commercial EV charger is $164.00. Permit issuance fee is separate. | $66.00 |
| Switchboard sub-panels (each), 0 to 600V FY 2026/27 schedule, effective July 1, 2026. | $41.00 |
| Meter reset FY 2026/27 schedule, effective July 1, 2026. Meter pedestal is $98.00. | $57.00 |
| Dwelling re-wire, partial / full FY 2026/27 schedule, effective July 1, 2026. | $103.00 / $188.00 |
Taken from the city's fee page. Commercial valuation-based fees and plan check can apply on top. Confirm at the permit counter.
Three RPU commercial classes
Riverside Public Utilities (RPU) is the city’s own electric utility, so SCE business rate plans do not apply here. RPU sorts commercial customers by demand.
- Schedule A, flat rate. For commercial accounts at or under 20 kW in any two of the previous 12 months.
- Schedule A, demand basis. For 20 kW up to 150 kW.
- Schedule TOU. For new service designed for 150 kW or more, or existing customers at or above 150 kW in any two of the previous 12 months.
New commercial customers are placed by the demand level the utility determines, and a customer who exceeds or falls below a class is transferred. For a small business, the line to watch is 20 kW. A restaurant adding a walk-in cooler and a second oven, or a shop adding chargers, can cross it. The bill then adds a demand charge, and the electrician’s load calculation should show the number before the order goes in. The panel and service upgrades page explains how to read that calculation.
A discount for growth, with a high bar
RPU has an Economic Development and Expansion rate for businesses relocating or expanding in Riverside. A new RPU customer needs at least 500 kW of minimum demand. An existing customer needs new load of at least 150 kW of monthly demand or 20 percent of existing load, whichever is higher. The rate also names research, development and technology companies and green technology or manufacturing firms, defined by industry codes. The discount is 40 percent per month in the first year and 20 percent in the second, on a 4-year contract. Most small shops will not qualify, but a manufacturer or lab planning a new line should call RPU’s account managers at 951-826-5485 before ordering equipment.
Rebates for lighting and chargers
RPU’s business lighting incentive pays by energy saved over one year. Level 1, standard efficient fixtures, pays $0.06 per kWh. Level 2 adds daylighting or occupancy sensors and pays $0.08. Level 3 covers projects with HID replacement or a combination of fixtures, controls and daylight harvesting, and pays $0.10. Caps are $25,000 for flat rate customers, $50,000 for demand customers and $100,000 for time-of-use customers, and a rebate cannot exceed 50 percent of project cost. Lighting has to be approved by RPU and installed at the service address. See LED lighting retrofits for how the energy code treats a fixture change.
For chargers, RPU’s business program reimburses equipment up to $5,000 per public-access station, and up to $10,000 per station for schools, qualified affordable housing, or DC fast sites with two or more ports, with a limit of five stations per location. A separate infrastructure rebate covers up to 50 percent of grid-side upgrade costs, up to $50,000, and RPU designs that work. The chargers must be new Level 2 or faster, open to the public in business hours, and installed by a licensed contractor with a city electrical permit. Applications are due within 180 days of installation, and the offer is first come, first served until funding is spent. The commercial EV charging page covers the design side. The city utility rebates guide covers household programs.
City permit lines for commercial work
The city’s fiscal year 2026/27 fee schedule, effective July 1, 2026, has commercial lines that differ from the home lines. A commercial EV charger is $164 each, against $66 for a residential one. Commercial lighting standards are $45 each, wall-mounted illuminated signs $94 each and monument signs $205 each. A 14 percent surcharge applies to items marked in the schedule. In the fire section, a tenant improvement fire sprinkler system with 1 to 199 sprinklers is $389 and a tenant improvement hood system plan check is $264. The city’s permits page says some permits are issued same day over the counter, but its examples are residential, and other projects may need plan review. Other agencies such as Planning, Public Works or Fire may have to approve first. Call the permit counter at 951-826-5800 for the path your job takes. The tenant improvement electrical page lists typical scope.
Historic downtown
For designated or eligible historic properties, such as buildings in the Mission Inn area downtown, the city says all exterior alterations, additions and repairs need a Certificate of Appropriateness, even when no building permit is required. The Cultural Heritage Board or historic preservation staff reviews the application. A new blade sign, an exterior conduit run or a moved meter on a downtown storefront can fall under that. Interior wiring is not the issue. Ask the Planning Division before the sign or exterior work is ordered.
What to send
Commercial electrical work in Riverside is available through the partner electrician. Send the building type, the address, whether you are the tenant, the owner or the property manager, and what is wrong or planned. A photo of the main panel and the RPU meter helps. Start from the commercial hub, the Riverside residential page or the county overview.
Send three things. Get a call.
Share the building, the job and a deadline. Your request goes to a licensed partner electrician, who contacts you about the building, the load and the permit path.
Commercial electrical work is available through the partner electrician.
- The buildingType of business, address and rough size.
- Who you areOwner, tenant, property manager or HOA board.
- The jobWhat is wrong or planned, and any deadline such as a lease date or inspection.
Commercial work in Riverside
Commercial electrical service and repair
Commercial EV charger installation for workplaces and retail
Commercial panel and service upgrades
Electrical maintenance agreements for commercial buildings
Exit signs and emergency lighting for businesses
What a property manager needs from an electrician
Electrical work in HOA and condo common areas
Commercial LED lighting retrofits and Title 24
EV charging for multifamily buildings and HOAs
Commercial electrical work in Orange County
Parking lot lighting for California businesses
Electrical work for restaurants and retail stores
Standby generator installation for businesses
Tenant improvement electrical: what a build-out needs
Warehouse and industrial electrical work in Ontario and the Inland Empire
Questions people ask
Which RPU rate class is my Riverside business on?
It depends on demand. Schedule A flat rate is for commercial customers at or under 20 kW in any two of the past 12 months. Schedule A demand basis covers 20 kW up to 150 kW. Schedule TOU begins at 150 kW. New customers are placed by the demand the utility determines. Customers who outgrow a schedule are transferred to the right one.
Does Riverside have a discount for a business that adds a lot of load?
There is an Economic Development and Expansion rate. A new RPU customer needs at least 500 kW of demand. An existing customer needs new load of 150 kW or 20 percent of existing load, whichever is higher. Qualifying businesses save 40 percent in the first year and 20 percent in the second, on a 4-year contract. Eligibility is set by industry codes.
How much does RPU pay for business lighting upgrades?
RPU pays $0.06, $0.08 or $0.10 per kilowatt-hour saved over one year, depending on the level of the project. Caps are $25,000 for flat rate customers, $50,000 for demand customers and $100,000 for time-of-use customers, and a rebate cannot exceed 50 percent of project cost. Lighting must be approved by RPU, so ask your account manager first.
What do I need to get RPU's public charger rebate?
You must be an active RPU commercial customer, install new Level 2 or faster chargers open to the public during business hours, use a licensed contractor and hold a city electrical permit. Apply within 180 days of installation. Funding is first come, first served. A separate infrastructure rebate covers up to 50 percent of grid-side upgrades, capped at $50,000.
Does exterior electrical work in downtown Riverside need historic review?
It can. For designated or eligible historic properties, the city says all exterior alterations, additions and repairs need a Certificate of Appropriateness, including work that does not need a building permit. The Cultural Heritage Board or historic preservation staff reviews it. Ask the Planning Division whether your building is designated before you order a new sign or conduit run.
Related
Commercial
Electrician in Riverside
Electrical work in Riverside County
Riverside County mixes SCE, a city-owned utility in Riverside and the Imperial Irrigation District in the…
Commercial LED lighting retrofits and Title 24
Swapping a warehouse or office to LED is regulated work in California when the change touches 10 percent…
Commercial EV charger installation for workplaces and retail
A business charger project is mostly an electrical capacity question. The charger is the small part; the…
Tenant improvement electrical: what a build-out needs
In a lease build-out, the electrician works from the landlord's service up to the last outlet. The code…
Commercial panel and service upgrades
A commercial service upgrade has two jobs: the electrician's work inside the building and the utility's…
City utility rebates in Pasadena, Burbank, Glendale, Riverside and Anaheim
What Pasadena Water and Power, Burbank, Glendale, Riverside and Anaheim utilities pay for chargers, panels…