What a heat pump needs from your electrical system
A heat pump needs its own 240-volt circuit, sized from the nameplate on the unit, plus a disconnect in sight. Most need 20 to 60 amps. Whether your panel can carry it is the real question, and a load calculation answers it.
Heat pumps move heat instead of making it, so they use less electricity than old electric heaters. They still need a solid circuit. The wiring side of a heat pump job has four parts: the circuit, the disconnect, the panel room and the permit.
The circuit
A heat pump is a 240-volt appliance. Its nameplate lists two numbers the electrician uses:
- Minimum circuit ampacity (MCA): the smallest wire the circuit can use.
- Maximum overcurrent protection (MOCP): the largest breaker allowed.
The electrician picks a breaker no bigger than the MOCP and a wire that fits the MCA. Common results:
| Equipment | Typical 240-volt circuit |
|---|---|
| Ductless mini-split, one room | 15 to 30 amps |
| Ducted heat pump, 2 to 5 tons | 20 to 60 amps |
| Heat pump water heater | 30 amps (some models use a 120-volt, 20-amp outlet) |
| Electric backup heat strips | Own breaker, sized from the air handler label |
Sizes depend on the exact model. Get the nameplate before the circuit is run. A 30 amp copper circuit uses 10 gauge wire, and a 50 or 60 amp circuit uses a heavier wire and conduit, which affects cost.
The disconnect
Code calls for a disconnect within sight of the outdoor unit. It is usually a small box on the wall next to the condenser. Some units come with a disconnect, but most jobs add one. It lets a technician cut power at the unit without going back to the panel.
Room in the panel
This is where the swing is. Replace an old electric furnace or a big A/C with a heat pump and the load often stays flat or drops. Add a heat pump to a house that has gas heat and the new load is real, especially with backup heat strips.
The electrician checks this with a load calculation. Three outcomes:
- Room to spare. Add the circuit. No panel work.
- Tight. A load manager or a small subpanel solves it. See EV charger load management for how managers work, since they apply to other loads too.
- Not enough. A 200 amp panel upgrade is the usual fix. That runs $2,500 to $4,500 in a typical SoCal range as of October 2026.
Other planned loads count too. If an EV charger, induction range or heat pump water heater are all coming, read electrification order of operations before you decide what to size for.
Heat pump water heaters
A heat pump water heater needs its own circuit and space. California’s electric-ready rules for new single-family homes show the two usual setups. Within 3 feet of the heater, a dedicated 125-volt, 20-amp receptacle is used. Farther away, a dedicated 240-volt, 30-amp branch circuit is used. Both come with a reserved space in the panel and a condensate drain. Those rules apply to new construction that installs gas appliances, not to retrofits, but they show what the equipment commonly wants.
Dryers (240 volts, 30 amps) and cooktops (240 volts, 50 amps) follow the same electric-ready pattern. See the heat pump and appliance circuits hub.
Permits and inspection
Expect two permits: an electrical permit for the circuit and disconnect, and a mechanical permit for the equipment. Inspectors check wire size, breaker, disconnect and bonding. Ask the HVAC company and the electrician who pulls each permit. The permits guide covers the basics.
What the electrical side costs
A new heat pump or 240-volt appliance circuit runs about $1,500 to $6,000 in a typical SoCal range as of October 2026 (a desk estimate; see the heat pump circuit cost page). The high end is panel work. The equipment and HVAC labor are priced separately.
What moves the number:
- distance from the panel to the unit
- wire size and whether conduit is needed
- stucco, slab or attic runs
- whether the panel needs breaker space or an upgrade
Rebates and rates
Riverside Public Utilities lists $750 per ton for an electric heat pump on matched equipment of 15.2 SEER or higher, apply within 90 days, subject to funds. Most other city utilities have their own programs, so check yours with the utility rebate finder.
State heat pump incentives from TECH Clean California and the state’s HEEHRA program were listed as waitlisted when this guide was checked, so confirm with the program before you plan around them. SCE’s TOU-D-PRIME rate is open to customers who attest to an EV, a home battery or an electric heat pump, with a 4 to 9 p.m. peak every day. Rates change, so compare plans before switching.
Before you buy
- Get the model and its nameplate numbers.
- Photograph your panel label and open breaker spaces. See how to read your panel.
- Ask the electrician for a load calculation result, not a guess.
- Ask who pulls the electrical and mechanical permits.
Questions people ask
What size breaker does a heat pump need?
The breaker size comes from the unit's nameplate, which lists a minimum circuit ampacity and a maximum overcurrent protection. Ducted systems often use a 20 to 60 amp, 240-volt breaker. Ductless mini-splits are often smaller. Do not guess from tonnage. Read the nameplate, or have the electrician read it, before the wire is bought.
Does a heat pump water heater need a 240 volt circuit?
Most do. A common requirement is a 240-volt, 30-amp circuit. Some models run on a standard 120-volt, 20-amp outlet when the heater sits close to the receptacle. Check the model you buy. California's electric-ready rules for new homes use both options, depending on the distance from the heater.
Will I need a bigger panel for a heat pump?
Not always. If you replace an electric furnace or an air conditioner with a heat pump, the load often changes little. If you add a heat pump to a house with gas heat, an electrician checks the load calculation. A full 100 amp panel may need a load manager or an upgrade.
Does a heat pump install need a permit?
Yes, in SoCal. The new circuit is an electrical permit job, and the equipment installation is usually a mechanical permit job. Ask who pulls each one. The HVAC contractor and the electrician may be different companies, so decide who pulls what before work starts.
Keep reading
Heat pump and appliance circuits
A heat pump, a heat pump water heater or an induction range each needs a circuit sized from the appliance…
Whole-home electrification in Southern California
Going all-electric works best when the panel and a load calculation come first, because every later step…
How much does a heat pump or 240V circuit cost?
Wiring a heat pump or another new 240V appliance typically costs $1,500 to $6,000 in SoCal. That is an…
Load calculation explained in plain English
The 220.83 method step by step with a worked example for a 1,800 sq ft home, and the 220.87 option based…
Going all-electric: what to do first, and when the panel comes in
A sensible order for EV charger, heat pump, water heater, range and solar, and when a load manager saves a…
200 amp panel upgrade: what changes and when you need it
A 200 amp panel upgrade swaps your old main panel for a new one and, usually, the wire from the meter to…
EV charger load management and circuit sharing
A load management device lowers the charger's draw when the rest of the house is busy. The code allows the…