Skip to content
Free quote. No obligation.Get a quote

Power from Anaheim Public Utilities

EV charger installation in Anaheim

Anaheim is served by its own city utility, so a charger job here follows city and APU rules, not SCE's. The permit sign-off also decides whether any local rebate can be paid.

Get a quote

Anaheim area home, Southern California: Two-story stucco homes in an Orange County neighborhood at evening

Why the utility changes the checklist

Anaheim Public Utilities is a city department, and SCE does not serve the city. SCE programs, SCE rate plans and SCE service planners are not part of the job. That cuts both ways. There is one fewer company to wait on, but nothing written for SCE customers applies, so an installer who works mostly in SCE towns may need to be told. Ask the electrician whether they have pulled charger permits in Anaheim before.

Treat the permit as part of the rebate

The municipal code requires a permit for every charging station, and the city’s local charger incentives depend on that permit being finished. A permit that never gets its final inspection can cost you the rebate, so ask the electrician to book the final the same week the charger is wired. Keep every receipt and photograph the charger’s serial number before it goes on the wall, since the label is hard to reach afterward. Incentives are paid while funds last, and the details change, so read the rebate table on this page and confirm with APU before you buy. The AB 1236 guide covers what the state requires a city to do with a charger application.

What the panel can spare

Anaheim has large 1950s to 1970s flatland tracts, and about four in ten homes were built before 1970. Many of those started with 60 to 100 amp service and overhead drops. A charger can be the load that fills such a panel, especially in a house that also runs central air through a hot inland summer. Ask for a load calculation and a price for both the charger-only and the upgrade versions, then compare them on the charger cost page. Downtown, the Colony, Five Points, Historic Palm and Hoskins districts add design review to exterior changes, so a charger on the street-facing wall or a new meter location deserves a call to the city first.

Parking you do not control

Only about half of Anaheim homes are single-family, and fewer than half are owner-occupied. Many drivers park in shared lots or leased spaces. The questions below cover the state rules for tenants and condo owners, and the HOA and condo charging page goes deeper. Ask APU which time-based rate fits your charging hours and whether joining one changes the incentive, and read the time-of-use guide to compare. More local background is on the Anaheim city page.

Diagram of an EV charger circuit from the main panel through a double-pole breaker and copper wire to a wall charger and the car
An EV charger circuit, panel to car. Illustration, not a photo of a specific job.

Charger permit path

Anaheim Municipal Code 15.05.040 requires a permit for each EV charging station. The city publishes an EV Charger Checklist (AB 1236 streamlining) and says that if the electrician's load calculation shows an upgrade is needed, a meter spot report from APU is required. Under AB 1236 (Government Code 65850.7) the city must approve compliant applications administratively and accept them electronically. Questions go to Building Services at 714-765-5153.

Permit lines that can apply

ItemFee
Minimum electrical permit fee$167.00
Supplemental permit fee$42.00

City of Anaheim Building Division (Planning and Building Services). Confirm the current amount at the counter.

Rebates that match this job

ProgramAmount
APU Private Use EV Charger Rebate
APU residential customers who install a Level 2 charger with a final-signed building permit
Up to $300 per Level 2 charger; up to $600 per networked charger if the customer also joins an available time-based rate. Subject to fund availability.
APU Electric Panel Upgrade Rebate (add-on to the EV charger rebate)
Customers in the Private Use EV Charger Rebate Program
Up to $750 for an electric panel upgrade (application form dated 5/20/26)

Questions people ask

What if the load calculation says my Anaheim panel is full?

The electrician has three options: a lower-amp charger, a load-sharing device, or a larger service. A larger service brings in Anaheim Public Utilities for a meter spot report before the building inspection. Ask for the calculation in writing, and ask the electrician to price the charger-only version next to the upgrade version.

Can an Anaheim renter ask the landlord for a charger?

Often yes. Civil Code 1947.6 says a landlord shall approve a written request for a charger at the tenant's assigned space on a lease signed or renewed after July 1, 2015, if the request meets the statute. The tenant pays for the work and power and carries insurance. Buildings with fewer than five spaces are excluded.

Can a condo board in Anaheim refuse my charger?

Not for an unreasonable reason. Civil Code 4745 voids rules that effectively prohibit or unreasonably restrict a charger in your unit or assigned space. The board must answer a written request in 60 days or it is deemed approved. The city also cannot make your charger permit depend on HOA approval.

Do I need a new permit to swap one charger for another in Anaheim?

Treat it as permitted work. The municipal code requires a permit for each charging station, and local rebates depend on a permit with final sign-off. Ask Building Services at 714-765-5153 whether a like-for-like replacement uses a lighter process, and keep the sign-off record with your receipts.

EV charger installation in nearby cities

Related

Call (909) 552-7102Quote