Solar inverter faults and system repair: who to call
Start with the inverter display and the app. For a fault or zero output, call the solar installer or a C-10 or C-46 contractor. For a burning smell, a tripped main or damaged wiring, call an electrician. Never touch roof wiring.
- Rapid shutdown: NEC 690.12
- Panel limit: 80 V in 30 seconds
- License: C-10 or C-46

Safe checks you can do from the ground
Solar wiring on the roof stays live whenever the sun is out, even with the main breaker off. Do not open junction boxes, cut cables or touch wiring on the roof. These checks are safe from the ground:
- Read the inverter display or the app. Write the error code and a photo.
- Confirm the inverter’s AC disconnect and the solar breaker at the main panel are on.
- Check whether the neighborhood is out. A grid-tied inverter stops with the grid.
- Look for snow, shade, debris or new shade that was not there before.
- Wait ten minutes and look again, since some codes are temporary.
If a code stays, an inverter reads zero all day, or you smell burning plastic, stop and call. A burning smell or a hot disconnect box is an emergency.
What rapid shutdown is
The National Electrical Code requires a rapid shutdown system on rooftop solar so firefighters cutting into a roof are not exposed to high voltage. The rule is NEC 690.12. Under the 2017 NEC, conductors outside the array boundary, which is one foot from the array, must drop to 30 volts within 30 seconds, and from 2019 conductors inside the boundary had to drop to 80 volts within 30 seconds. Microinverters, optimizers and similar module devices became common because they meet that. The 2023 NEC, which California’s 2025 code is based on, requires a listed PV hazard control system, with the 80 volt and 30 second limit kept in the rule.
What this means for you:
- There is a rapid shutdown switch or device, often near the meter or the inverter, labeled for firefighters.
- If the system will not start after the switch was used, it may need a reset in the right order. Follow the maker’s steps or call for service.
- Do not jumper or bypass it. That removes a safety feature the inspector approved.
Who to call
| Symptom | First call |
|---|---|
| Inverter error code, no production | Solar installer or manufacturer service |
| Panels cracked, roof wiring damaged | Solar contractor |
| Burning smell, hot disconnect, tripped main | Licensed electrician now |
| Solar breaker trips, panel problem | Electrician. See breaker keeps tripping |
| Battery or gateway error | Battery installer or C-10 electrician |
| Installer is gone | See solar installer bankrupt |
California’s contractor rules let both C-10 electrical contractors and C-46 solar contractors install photovoltaic systems. A C-46 license can install and repair solar systems but is limited to work needed for them. A C-10 license covers the wider electrical system. Verify any bidder’s license. The license guide shows how.
Detach and reset for roof work
If the roof needs re-roofing or repair, the panels must come off and go back on. That is called detach and reset. The sequence is:
- The solar contractor or electrician shuts the system down and disconnects the array.
- The panels and racking come off.
- The roofer replaces or repairs the roof.
- The panels are re-mounted, wired and tested.
- The city inspects and the utility is told, if required.
Do not let a roofer disconnect panels without a licensed contractor, because wires remain live in daylight. Get the detach and reset written into the roofer’s bid, and ask who pays for it. Check your solar warranty first, since roof penetrations may affect it.
Ask about the battery
If you have a battery, the shutdown has to include it. Battery systems add a gateway and extra disconnects. See solar and battery tie-in and home battery installation.
What to have ready
- The inverter model and serial number
- A photo of the display and any error code
- Date of installation and the installer’s name
- Your utility account and interconnection papers
- Photos of the main panel and the solar disconnect
Warranty and records
Inverters often carry a longer warranty than the workmanship on the install. Before anyone replaces a part, find the paperwork: the installer contract, inverter manual, permit and interconnection approval. Manufacturers usually need a serial number and an error log. Keep photos of the display from before and after the repair, and ask the contractor to note any new part numbers on the invoice.
Questions people ask
My solar produced nothing today. What should I check?
Look at the inverter display or the app for an error code. Check that the AC disconnect and the solar breaker at the main panel are on. Check for a utility outage, since grid-tied inverters stop with the grid. Do not climb on the roof. If the code or the breaker does not clear, call the installer or a solar contractor.
What is rapid shutdown and why did it trip?
Rapid shutdown is a safety feature that cuts rooftop solar voltage so firefighters can work on a roof. It trips when the shutdown switch is used, when the inverter loses its signal, or when a fault occurs. Do not bypass it. A solar contractor can find which device is at fault.
Should I call an electrician or the solar company?
Call the solar company first if the system is under warranty or if the fault is on the inverter or panels. Call a licensed electrician for panel breakers, burning smells, a tripped main, damaged wiring or a faulty disconnect. A C-10 electrician can often handle both sides if the manufacturer's service is available.
Do I need a permit to detach and reset solar for a roof job?
Often yes. Taking down and re-installing panels is electrical work, and many cities want a permit and inspection when the system is reconnected. A roofer can remove shingles, but a licensed solar or electrical contractor should disconnect and reconnect the system. Ask your building department what it requires.
Keep reading
Solar and battery tie-in at the electrical panel
A tie-in is the wiring that connects solar panels, inverter, battery and your main panel. Owners need it…
Home batteries: what the electrician does and where one can go
The electrician mounts the battery, connects it to the panel or a backup subpanel, and gets it permitted…
Your solar installer went bankrupt: what to do next
Who owns your system, which warranties survive a solar company bankruptcy, and who can service it now.
Why your breaker keeps tripping
A breaker trips to stop too much current. The cause is an overload, a short circuit, a ground fault or a…
How to verify an electrician's license in California
A five-minute CSLB check: license status, C-10 class, bond, workers' comp, and the contract terms the law…
Electrical emergency: what to do first and who to call
If you see fire, smoke or sparks, get out and call 911. If the danger is contained and the power is off…
Send a photo, get a range.
Share your ZIP and a photo of your panel. Your request goes to a licensed partner electrician, who contacts you.
Get this quoteAurion Electric is a referral service operated by Roviq LLC. Electrical work is done by a licensed partner electrician.