The panel upgrade guide

Electrical panel and service upgrades in Massachusetts

Going electric with a heat pump, an EV charger or an induction range? How to tell if the panel and service can carry it, who has to do what, and in what order.

  • Checked: November 2026
  • Code: 2026 NEC, MA amendments

Send photos of my panel

An open electrical panel with labeled breakers next to an electric meter
Code in force2026 NECwith Massachusetts amendments, for permits granted after April 24, 2026 527 CMR 12
Typical home service200 AEversource lists one meter, 200 amp, single-phase, 120/240 volt as typical residential service Eversource
PermitAlwaysThe electrician files it. The inspector answers within 5 days of the completion notice M.G.L. c.143 s.3L
National Grid, simple upgrade2 to 6 weeksof National Grid time. Electrician, permit and inspection are extra National Grid
Eversource, after inspection5 business daysto install service once the wiring inspector gives final approval Eversource
Mass Save, income-basedUp to 100%of a needed panel upgrade, after cost-effectiveness screening Mass Save

The short version. A heat pump, a charger or a new range adds electrical load. Your electrician adds it up from the nameplates and compares it with your service. If it fits with room to spare, you may only need new circuits. If not, the fix is a bigger service, or smaller and smarter loads. Either way a licensed electrician pulls the permit, the town inspector signs off, and the utility reconnects.

Panel, service, or just a circuit?

People say "panel upgrade" for three different jobs. They differ in who you have to call.

JobWhat changesUtility request?
New circuitA breaker and wire for one new load, in a panel that has room and capacity.No. Permit and inspection still apply.
Panel swapA new breaker box on the same service size. National Grid says replacing only the panel or wiring does not increase your capacity. National GridNot an upgrade on the utility's side. Ask the utility if the meter or disconnect will be touched.
Service upgradeMore amps delivered: for example 100 A to 200 A. New service entrance cable, meter socket and main. Eversource: "changed or upgraded service is when service is increased." EversourceYes. Eversource, National Grid and light plants each have their own form. How each one works.

Meter to panel: the parts, and who owns them

The service is a chain. The utility's wires reach the house, a meter measures them, a main disconnect shuts everything off, and the panel splits the power into circuits. The service size, in amps, is set by the weakest link in that chain.

From the street to the panelTop to bottom: pole and street lines, service drop, weatherhead and meter, service disconnect, panel, then the heat pump, EV charger and induction range circuits. The utility owns the line from the pole and sets the meter. The home side starts at the weatherhead.UTILITY SIDEYOUR SIDE: LICENSED ELECTRICIANPole, transformer, street linesService droputility owns the linefrom the poleor an underground lateralWeatherheadand service entrance cableMeterutility sets itsocket: your sideService disconnectmain breakerPanelbreakers and circuitsHeat pumpEV chargerInductionrange
Who owns what follows Reading Municipal Light Department's homeowner page and National Grid's upgrade guide. Other utilities draw the line in slightly different places, so ask yours.

Massachusetts amends NEC 230.70: for one- and two-family homes, service disconnects go in a readily accessible outdoor location, with an exception for an indoor disconnect on a service fed underground, if it can be shut off by a remote control outside. A second exception says that if only meter sockets, service entrance conductors, main breakers or related raceways and fittings are replaced, that outdoor rule does not apply. Mass.gov Mass.gov Ask your inspector how it applies to your job.

Do you need one?

You find out by adding up the loads, not by guessing from the age of the house. The DOE's worksheet starts with floor area, small-appliance circuits and the nameplate of everything fastened in place, then adds the larger of heating or cooling. Electricians use the nameplate, which is the maximum an appliance can draw, so the answer errs on the safe side. U.S. Department of Energy

Service size against the 80 percent lineA 100 amp service is 24,000 volt-amps at 240 volts, with its 80 percent line at 19,200. A 200 amp service is 48,000 volt-amps, with its 80 percent line at 38,400.100 A service24,000 VA80%: 19,200 VA200 A service48,000 VA80%: 38,400 VA
Amps times 240 volts is volt-amps (DOE factsheet). The factsheet says electricians recommend the load never exceeds 80 percent of the service capacity. The line shows where that sits.

Two different limits can force an upgrade. The panel can run out of physical space for breakers, or out of electrical capacity. Adding up breaker ratings does not tell you which, because breakers usually add up to more than the panel rating and not everything runs at once. U.S. Department of Energy

Our 100A vs 200A guide explains the arithmetic step by step and has an estimator you can fill in with your own nameplates.

Old panel, new heat pump or charger on the way?Send a photo of the panel with the door open. Aurion looks at it and gets back to you.
Send photos

The steps, in order

  1. 1Week 0Look and sizeElectrician checks the panel and meter, adds up the loads, and settles the scope.Electrician
  2. 2Before workPermitThe electrician files the wiring permit with the town inspector.Town
  3. 3Before workUtility requestFor more amps, a request goes to the utility. Apply early.Utility
  4. 4Work dayDisconnect and swapUtility disconnects by appointment. Electrician replaces the equipment.Electrician and utility
  5. 5After workInspectionInspector approves or lists what to fix. The utility waits for this.Town
  6. 6LastReconnect and meterUtility makes the final connection and sets or checks the meter.Utility

Sources for each step: the permit and inspection rules are in permits and inspections, the utility side is in the utility guide. The two rules that set the order: the inspector has five days to approve or disapprove after the completion notice Mass. General Laws, and the utility will not connect until it has the approval National Grid Eversource.

What each electrification project asks of the panel

A breaker panel and a wall-mounted EV charger in a garage
A charger, a heat pump or a range adds at least one circuit and one more nameplate load to the electrician's estimate.
ProjectWhat the electrician needsWhere to read it
Heat pumpThe outdoor unit's and air handler's electrical rating, any backup electric heat, and space in the panel for a new breaker and a wire path to it.The nameplate on the units, or the installer's data sheet.
EV chargerThe charger's rated amps at 240 volts, a circuit, and permit. Eversource's rebate covers chargers of 80 amps or less. EversourceThe charger's label or manual.
Induction rangeThe range's nameplate rating, a 240 volt circuit, and the existing cable's capacity.The label inside the oven frame or the spec sheet.
Heat pump water heater, dryerEach adds a nameplate load to the estimate. The DOE lists dryers and water heaters among the common triggers. U.S. Department of EnergyAppliance label.

Do not size the circuit from this table. The nameplate and the electrician's calculation decide.

Old panels and old wiring

If you have a fuse box, a Federal Pacific or Zinsco panel, or knob and tube wiring, other issues come first: insurance, a sale, and whether insulation can go in. We keep those on their own pages so the facts stay in one place.

Who does the work

Massachusetts says only a master or journeyman electrician licensed by the Board of State Examiners of Electricians can legally be hired to do electrical work at your home. Mass.gov You can verify a licence by calling the Board at (617) 701-8786. Mass.gov The state also tells homeowners to ask to see the permit. Mass.gov

Aurion takes the project from the photos to the finished service. Licensed work is done by licensed Massachusetts technicians, and the permit is in the licensed electrician's name.

What it costs

Aurion prices a panel or service job after seeing photos of the panel and meter, so there is no price on this page. The one published number we use is from Boston's permit records: from 2025-11-01 to 2026-11-02, at least 1,068 Boston one-to-four-family electrical permits were for a service or panel change, and the median value applicants declared on them was $7,500. That is what applicants wrote on the permit form, not a quote or a price list. Analyze Boston See the Boston permit data.

Money that can offset the cost is in the rebates guide.

Common questions

Do I need a new electrical panel for a heat pump in Massachusetts?

Not always. It depends on the service you have now, the space in the panel, and what else the house runs. An electrician has to run a load estimate with the heat pump's nameplate. Homes with 60 or 100 amp service or a fuse box are the ones that most often need work. The DOE factsheet says electricians recommend the load never exceeds 80 percent of the service capacity.

What is the difference between a panel upgrade and a service upgrade?

A panel swap replaces the breaker box. A service upgrade raises the amps the utility delivers: new service entrance cable, meter socket and main, plus a request to Eversource, National Grid or your light plant. National Grid says replacing only the electrical panel or wiring does not increase your home's power capacity and is not an electric upgrade on its side.

Who pulls the permit for a panel upgrade?

The licensed electrician who does the work. Under 527 CMR 12.00 the electrical permit is issued to the person, firm or corporation named on the application, and that party must give the completion notice. Boston says homeowners must hire a licensed contractor to apply for the permit and do the work.

Which electrical code applies in Massachusetts right now?

The 2026 National Electrical Code (NFPA 70) with Massachusetts amendments, effective April 24, 2026. 527 CMR 12.00 says it applies to installations for which a permit was granted after that date, so the date on your permit decides which edition your job follows.

How long does a service upgrade take?

There is no single number. National Grid lists a simple residential connection at 2 to 6 weeks of its own time, not counting the electrician's work, paperwork and the town inspection. Eversource commits to install service within 5 business days after the wiring inspector's final approval, provided all requirements are met. Apply early; Eversource says to apply as far in advance as possible.

Will my power be off during the upgrade?

For a service upgrade, yes, for the time the utility has you disconnected. The utility disconnects before the work and reconnects after the town inspector approves. National Grid says the electrician schedules the disconnect and reconnect and that there might be a temporary loss of power while the electrician does the upgrade. Ask your electrician for the window in writing.

Does Mass Save pay for a panel upgrade?

For households that qualify for the income-based turnkey offer, Mass Save says up to 100% of a panel upgrade needed for new equipment may be covered, after cost-effectiveness screening. Mass Save also lists 0% financing on approved electrical panel upgrades. Standard per-ton heat pump rebates do not list a panel. See the rebates guide.

Can I avoid a panel upgrade?

Sometimes. Options include power-efficient equipment, circuit-sharing devices, smart panels and load management. Reading Municipal Light Department pays up to $1,200 toward qualifying load management devices. Whether one is accepted on your job is up to your electrician and your inspector. See the alternatives guide.

What if my house has a fuse box, a Federal Pacific or Zinsco panel, or knob and tube wiring?

Those are their own topics, because they touch insurance, home sales and what the wiring will carry. Aurion has separate pages for fuse boxes and insurance and for knob and tube wiring. Start there, then come back to the service size question.

How do I check that an electrician is licensed?

Massachusetts says only a master or journeyman electrician licensed by the Board of State Examiners of Electricians can legally be hired to do electrical work at your home. Call the Board at (617) 701-8786 to verify the licence, or search the state's licensee portal. Ask to see the permit.

Related: Mass Save heat pump rebates by town, home EV chargers, heat pumps, Boston electrical permits. Questions? Call (781) 210-8400.

Heat pump coming and the panel is old?

Send a photo of the panel with the door open. We look at it and get back to you.

Send photos
Call (781) 210-8400Send photos